Member State report / Art8 / 2018 / D10 / Bulgaria / Black Sea
Report type | Member State report to Commission |
MSFD Article | Art. 8 Initial assessment (and Art. 17 updates) |
Report due | 2018-10-15 |
GES Descriptor | D10 Litter |
Member State | Bulgaria |
Region/subregion | Black Sea |
Reported by | Ministry of Environment and Water |
Report date | 2022-03-29 |
Report access | BG_ART8_GES.xml |
Coastal (BLK-BG-AA-Coastal)
GES component |
D10
|
D10
|
---|---|---|
Feature |
Litter in the environment
|
Litter in the environment
|
Element |
Macrolitter (all) |
Microlitter (all) |
Element code |
||
Element code source |
||
Element 2 |
||
Element 2 code |
||
Element 2 code source |
||
Element source |
EU |
EU |
Criterion |
D10C1
|
D10C2
|
Parameter |
Amount on coastline
|
Amount on coastline
|
Parameter other |
||
Threshold value upper |
||
Threshold value lower |
||
Threshold qualitative |
||
Threshold value source |
||
Threshold value source other |
||
Value achieved upper |
11748.0 |
|
Value achieved lower |
2.0 |
|
Value unit |
Other
|
number of items per kilogram of dry weight
|
Value unit other |
items per 100 m coastline
|
|
Proportion threshold value |
||
Proportion value achieved |
||
Proportion threshold value unit |
||
Trend |
Unknown |
Unknown |
Parameter achieved |
Not assessed |
Unknown |
Description parameter |
||
Related indicator |
|
|
Criteria status |
Not assessed |
Unknown |
Description criteria |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses) |
|
Element status |
Not assessed |
Unknown |
Description element |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses). |
Integration rule type parameter |
||
Integration rule description parameter |
||
Integration rule type criteria |
Other
|
Other
|
Integration rule description criteria |
||
GES extent threshold |
||
GES extent achieved |
||
GES extent unit |
||
GES achieved |
Unknown |
Unknown |
Description overall status |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. For criteria D10C2, D10C3 and D10C4 we do not have technical capacity , expertise and related infrastructure (monitoring and data analyses). |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. For criteria D10C2, D10C3 and D10C4 we do not have technical capacity , expertise and related infrastructure (monitoring and data analyses). |
Assessments period |
2012-2017 |
2012-2017 |
Related pressures |
||
Related targets |
|
|
Emine-Sozopol (BLK-BG-AA-EmineMaslennos)
GES component |
D10
|
D10
|
D10
|
D10
|
---|---|---|---|---|
Feature |
Litter in the environment
|
Litter in the environment
|
Litter in the environment
|
Litter in the environment
|
Element |
Macrolitter (all) |
Macrolitter (all) |
Microlitter (all) |
Microlitter (all) |
Element code |
||||
Element code source |
||||
Element 2 |
||||
Element 2 code |
||||
Element 2 code source |
||||
Element source |
EU |
EU |
EU |
EU |
Criterion |
D10C1
|
D10C1
|
D10C2
|
D10C2
|
Parameter |
Amount on seabed
|
Amount on water surface
|
Amount on seabed
|
Amount on water surface
|
Parameter other |
||||
Threshold value upper |
||||
Threshold value lower |
||||
Threshold qualitative |
||||
Threshold value source |
||||
Threshold value source other |
||||
Value achieved upper |
1796.0 |
|||
Value achieved lower |
70.0 |
|||
Value unit |
number of items per square kilometre
|
number of items per square kilometre
|
number of items per kilogram of dry weight
|
number of items per square metre
|
Value unit other |
||||
Proportion threshold value |
||||
Proportion value achieved |
||||
Proportion threshold value unit |
||||
Trend |
Unknown |
Unknown |
Unknown |
Unknown |
Parameter achieved |
Not assessed |
Not assessed |
Unknown |
Unknown |
Description parameter |
||||
Related indicator |
|
|
||
Criteria status |
Not assessed |
Not assessed |
Unknown |
Unknown |
Description criteria |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. For criteria D10C2, D10C3 and D10C4 we do not have technical capacity , expertise and related infrastructure (monitoring and data analyses). |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. For criteria D10C2, D10C3 and D10C4 we do not have technical capacity , expertise and related infrastructure (monitoring and data analyses). |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses). |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses). |
Element status |
Not assessed |
Not assessed |
Unknown |
Unknown |
Description element |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses). |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses). |
||
Integration rule type parameter |
||||
Integration rule description parameter |
||||
Integration rule type criteria |
Not relevant
|
Not relevant
|
Not relevant
|
Not relevant
|
Integration rule description criteria |
||||
GES extent threshold |
||||
GES extent achieved |
||||
GES extent unit |
||||
GES achieved |
Unknown |
Unknown |
Unknown |
Unknown |
Description overall status |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. For criteria D10C2, D10C3 and D10C4 we do not have technical capacity , expertise and related infrastructure (monitoring and data analyses). |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. For criteria D10C2, D10C3 and D10C4 we do not have technical capacity , expertise and related infrastructure (monitoring and data analyses). |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. For criteria D10C2, D10C3 and D10C4 we do not have technical capacity , expertise and related infrastructure (monitoring and data analyses). |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. For criteria D10C2, D10C3 and D10C4 we do not have technical capacity , expertise and related infrastructure (monitoring and data analyses). |
Assessments period |
2012-2017 |
2012-2017 |
2012-2017 |
2012-2017 |
Related pressures |
|
|
|
|
Related targets |
|
|
|
|
Galata-Emine (BLK-BG-AA-GalataEmine)
GES component |
D10
|
D10
|
D10
|
D10
|
---|---|---|---|---|
Feature |
Litter in the environment
|
Litter in the environment
|
Litter in the environment
|
Litter in the environment
|
Element |
Macrolitter (all) |
Macrolitter (all) |
Microlitter (all) |
Microlitter (all) |
Element code |
||||
Element code source |
||||
Element 2 |
||||
Element 2 code |
||||
Element 2 code source |
||||
Element source |
EU |
EU |
EU |
EU |
Criterion |
D10C1
|
D10C1
|
D10C2
|
D10C2
|
Parameter |
Amount on seabed
|
Amount on water surface
|
Amount on seabed
|
Amount on water surface
|
Parameter other |
||||
Threshold value upper |
||||
Threshold value lower |
||||
Threshold qualitative |
||||
Threshold value source |
||||
Threshold value source other |
||||
Value achieved upper |
8441.0 |
|||
Value achieved lower |
27.0 |
|||
Value unit |
number of items per square kilometre
|
number of items per square kilometre
|
number of items per kilogram of dry weight
|
number of items per kilogram of dry weight
|
Value unit other |
||||
Proportion threshold value |
||||
Proportion value achieved |
||||
Proportion threshold value unit |
||||
Trend |
Unknown |
Unknown |
Unknown |
Unknown |
Parameter achieved |
Not assessed |
Not assessed |
Unknown |
Unknown |
Description parameter |
||||
Related indicator |
|
|
||
Criteria status |
Not assessed |
Not assessed |
Unknown |
Unknown |
Description criteria |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses) |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses) |
Element status |
Not assessed |
Not assessed |
Unknown |
Unknown |
Description element |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses) |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses) |
||
Integration rule type parameter |
||||
Integration rule description parameter |
||||
Integration rule type criteria |
Not relevant
|
Not relevant
|
Not relevant
|
Not relevant
|
Integration rule description criteria |
||||
GES extent threshold |
||||
GES extent achieved |
||||
GES extent unit |
||||
GES achieved |
Unknown |
Unknown |
Unknown |
Unknown |
Description overall status |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
Assessments period |
2012-2017 |
2012-2017 |
2012-2017 |
2012-2017 |
Related pressures |
|
|
|
|
Related targets |
|
|
|
|
Kaliakra-Galata (BLK-BG-AA-KaliakraGalata)
GES component |
D10
|
D10
|
D10
|
D10
|
---|---|---|---|---|
Feature |
Litter in the environment
|
Litter in the environment
|
Litter in the environment
|
Litter in the environment
|
Element |
Macrolitter (all) |
Macrolitter (all) |
Microlitter (all) |
Microlitter (all) |
Element code |
||||
Element code source |
||||
Element 2 |
||||
Element 2 code |
||||
Element 2 code source |
||||
Element source |
EU |
EU |
EU |
EU |
Criterion |
D10C1
|
D10C1
|
D10C2
|
D10C2
|
Parameter |
Amount on seabed
|
Amount on water surface
|
Amount on seabed
|
Amount on water surface
|
Parameter other |
||||
Threshold value upper |
||||
Threshold value lower |
||||
Threshold qualitative |
||||
Threshold value source |
||||
Threshold value source other |
||||
Value achieved upper |
774.0 |
|||
Value achieved lower |
26.0 |
|||
Value unit |
number of items per square kilometre
|
number of items per square kilometre
|
number of items per kilogram of dry weight
|
number of items per square metre
|
Value unit other |
||||
Proportion threshold value |
||||
Proportion value achieved |
||||
Proportion threshold value unit |
||||
Trend |
Unknown |
Unknown |
Unknown |
Unknown |
Parameter achieved |
Not assessed |
Not assessed |
Unknown |
Unknown |
Description parameter |
||||
Related indicator |
|
|
||
Criteria status |
Not assessed |
Not assessed |
Unknown |
Unknown |
Description criteria |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses) |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses) |
Element status |
Not assessed |
Not assessed |
Unknown |
Unknown |
Description element |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses) |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses) |
||
Integration rule type parameter |
||||
Integration rule description parameter |
||||
Integration rule type criteria |
Not relevant
|
Not relevant
|
Not relevant
|
Not relevant
|
Integration rule description criteria |
||||
GES extent threshold |
||||
GES extent achieved |
||||
GES extent unit |
||||
GES achieved |
Unknown |
Unknown |
Unknown |
Unknown |
Description overall status |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
Assessments period |
2012-2017 |
2012-2017 |
2012-2017 |
2012-2017 |
Related pressures |
|
|
|
|
Related targets |
|
|
|
|
Sozopol-Rezovo (BLK-BG-AA-MaslennosRezovo)
GES component |
D10
|
D10
|
D10
|
---|---|---|---|
Feature |
Litter in the environment
|
Litter in the environment
|
Litter in the environment
|
Element |
Macrolitter (all) |
Macrolitter (all) |
Microlitter (all) |
Element code |
|||
Element code source |
|||
Element 2 |
|||
Element 2 code |
|||
Element 2 code source |
|||
Element source |
EU |
EU |
EU |
Criterion |
D10C1
|
D10C1
|
D10C2
|
Parameter |
Amount on seabed
|
Amount on water surface
|
Amount on coastline
|
Parameter other |
|||
Threshold value upper |
|||
Threshold value lower |
|||
Threshold qualitative |
|||
Threshold value source |
|||
Threshold value source other |
|||
Value achieved upper |
|||
Value achieved lower |
|||
Value unit |
number of items per square kilometre
|
number of items per square kilometre
|
number of items per kilogram of dry weight
|
Value unit other |
|||
Proportion threshold value |
|||
Proportion value achieved |
|||
Proportion threshold value unit |
|||
Trend |
Unknown |
Unknown |
Unknown |
Parameter achieved |
Unknown |
Unknown |
Unknown |
Description parameter |
|||
Related indicator |
|
||
Criteria status |
Unknown |
Unknown |
Unknown |
Description criteria |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses). |
||
Element status |
Unknown |
Unknown |
Unknown |
Description element |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses) |
||
Integration rule type parameter |
|||
Integration rule description parameter |
|||
Integration rule type criteria |
Not relevant
|
Not relevant
|
Not relevant
|
Integration rule description criteria |
|||
GES extent threshold |
|||
GES extent achieved |
|||
GES extent unit |
|||
GES achieved |
Unknown |
Unknown |
Unknown |
Description overall status |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
Assessments period |
2012-2017 |
2012-2017 |
2012-2017 |
Related pressures |
|
|
|
Related targets |
|
|
|
Open sea (BLK-BG-AA-OpenSea)
GES component |
D10
|
D10
|
D10
|
---|---|---|---|
Feature |
Litter in the environment
|
Litter in the environment
|
Litter in the environment
|
Element |
Macrolitter (all) |
Microlitter (all) |
Microlitter (all) |
Element code |
|||
Element code source |
|||
Element 2 |
|||
Element 2 code |
|||
Element 2 code source |
|||
Element source |
EU |
EU |
EU |
Criterion |
D10C1
|
D10C2
|
D10C2
|
Parameter |
Amount on water surface
|
Amount on seabed
|
Amount on water surface
|
Parameter other |
|||
Threshold value upper |
|||
Threshold value lower |
|||
Threshold qualitative |
|||
Threshold value source |
|||
Threshold value source other |
|||
Value achieved upper |
857.0 |
||
Value achieved lower |
|||
Value unit |
number of items per square kilometre
|
number of items per kilogram of dry weight
|
number of items per square metre
|
Value unit other |
|||
Proportion threshold value |
|||
Proportion value achieved |
|||
Proportion threshold value unit |
|||
Trend |
Unknown |
Unknown |
Unknown |
Parameter achieved |
Not assessed |
Unknown |
Unknown |
Description parameter |
|||
Related indicator |
|
|
|
Criteria status |
Not assessed |
Unknown |
Unknown |
Description criteria |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses). |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses). |
Element status |
Not assessed |
Unknown |
Unknown |
Description element |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses) |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses) |
|
Integration rule type parameter |
|||
Integration rule description parameter |
|||
Integration rule type criteria |
Not relevant
|
Not relevant
|
Not relevant
|
Integration rule description criteria |
|||
GES extent threshold |
|||
GES extent achieved |
|||
GES extent unit |
|||
GES achieved |
Unknown |
Unknown |
Unknown |
Description overall status |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
Assessments period |
2012-2017 |
2012-2017 |
2012-2017 |
Related pressures |
|
|
|
Related targets |
|
|
|
Shelf (BLK-BG-AA-Shelf)
GES component |
D10
|
D10
|
D10
|
D10
|
---|---|---|---|---|
Feature |
Litter in the environment
|
Litter in the environment
|
Litter in the environment
|
Litter in the environment
|
Element |
Macrolitter (all) |
Macrolitter (all) |
Microlitter (all) |
Microlitter (all) |
Element code |
||||
Element code source |
||||
Element 2 |
||||
Element 2 code |
||||
Element 2 code source |
||||
Element source |
EU |
EU |
EU |
EU |
Criterion |
D10C1
|
D10C1
|
D10C2
|
D10C2
|
Parameter |
Amount on seabed
|
Amount on water surface
|
Amount on seabed
|
Amount on water surface
|
Parameter other |
||||
Threshold value upper |
||||
Threshold value lower |
||||
Threshold qualitative |
||||
Threshold value source |
||||
Threshold value source other |
||||
Value achieved upper |
4853.0 |
|||
Value achieved lower |
||||
Value unit |
number of items per square kilometre
|
number of items per square kilometre
|
number of items per kilogram of dry weight
|
number of items per square metre
|
Value unit other |
||||
Proportion threshold value |
||||
Proportion value achieved |
||||
Proportion threshold value unit |
||||
Trend |
Unknown |
Unknown |
Unknown |
Unknown |
Parameter achieved |
Not assessed |
Not assessed |
Unknown |
Unknown |
Description parameter |
||||
Related indicator |
|
|
||
Criteria status |
Not assessed |
Not assessed |
Unknown |
Unknown |
Description criteria |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses) |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses) |
Element status |
Not assessed |
Not assessed |
Unknown |
Unknown |
Description element |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses). |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses). |
||
Integration rule type parameter |
||||
Integration rule description parameter |
||||
Integration rule type criteria |
Not relevant
|
Not relevant
|
Not relevant
|
Not relevant
|
Integration rule description criteria |
||||
GES extent threshold |
||||
GES extent achieved |
||||
GES extent unit |
||||
GES achieved |
Unknown |
Unknown |
Unknown |
Unknown |
Description overall status |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
Assessments period |
2012-2017 |
2012-2017 |
2012-2017 |
2012-2017 |
Related pressures |
|
|
|
|
Related targets |
|
|
|
|
Sivriburun-Kaliakra (BLK-BG-AA-SivriburunKaliakra)
GES component |
D10
|
D10
|
D10
|
---|---|---|---|
Feature |
Litter in the environment
|
Litter in the environment
|
Litter in the environment
|
Element |
Macrolitter (all) |
Macrolitter (all) |
Microlitter (all) |
Element code |
|||
Element code source |
|||
Element 2 |
|||
Element 2 code |
|||
Element 2 code source |
|||
Element source |
EU |
EU |
EU |
Criterion |
D10C1
|
D10C1
|
D10C2
|
Parameter |
Amount on seabed
|
Amount on water surface
|
Amount on water surface
|
Parameter other |
|||
Threshold value upper |
|||
Threshold value lower |
|||
Threshold qualitative |
|||
Threshold value source |
|||
Threshold value source other |
|||
Value achieved upper |
512.0 |
||
Value achieved lower |
34.0 |
||
Value unit |
number of items per square kilometre
|
number of items per square kilometre
|
number of items per square metre
|
Value unit other |
|||
Proportion threshold value |
|||
Proportion value achieved |
|||
Proportion threshold value unit |
|||
Trend |
Unknown |
Unknown |
Unknown |
Parameter achieved |
Unknown |
Not assessed |
Unknown |
Description parameter |
|||
Related indicator |
|
||
Criteria status |
Unknown |
Unknown |
Unknown |
Description criteria |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses). |
Element status |
Unknown |
Unknown |
Unknown |
Description element |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on micro -litter due to the knowledge gaps. For criteria D10C2 we do not have technical capacity, expertise and related infrastructure (monitoring and data analyses) |
||
Integration rule type parameter |
|||
Integration rule description parameter |
|||
Integration rule type criteria |
Not relevant
|
Not relevant
|
Not relevant
|
Integration rule description criteria |
|||
GES extent threshold |
|||
GES extent achieved |
|||
GES extent unit |
|||
GES achieved |
Unknown |
Unknown |
Unknown |
Description overall status |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
During the first cycle of the Marine Strategy in 2012, it was not possible to report any type of assessment on marine litter due to the knowledge gaps . Although some data was collected for D10 for the period 2012-2017 we need data for 6- year period for assessment. Today we do not have yet a significant time series to indicate the status of the specific element of D10C1. |
Assessments period |
2012-2017 |
2012-2017 |
2012-2017 |
Related pressures |
|
|
|
Related targets |
|
|
|