Member State report / Art10 / 2018 / D8 / Spain / Mediterranean: Western Mediterranean Sea

Report type Member State report to Commission
MSFD Article Art. 10 Environmental targets (and Art. 17 updates)
Report due 2018-10-15
GES Descriptor D8 Contaminants
Member State Spain
Region/subregion Mediterranean: Western Mediterranean Sea
Reported by Subdirección General para la Protección del Mar. D.G. Sostenibilidad de la Costa y del Mar. Minister
Report date 2020-02-03
Report access msfd2018-ART10.XML

Target code
00
00
A.1.9
A.1.9
A.E.10
A.L.10
B.1.1
B.1.1
B.1.2
B.1.2
B.2.1
B.2.1
B.2.2
B.2.2
B.2.3
B.2.3
B.2.4
B.2.4
B.3.2
B.3.2
B.E.13
B.E.15
B.E.16
B.E.17
B.E.18
B.E.2.
B.E.3
B.E.4
B.E.5
B.E.6
B.L.13
B.L.14
B.L.15
B.L.16
B.L.17
B.L.18
B.L.2.
B.L.3
B.L.4
B.L.5
B.L.6
C.1.3
C.1.3
C.1.4
C.1.4
C.3.1
C.3.1
C.3.5
C.3.5
C.E.12
C.E.15
C.E.16
C.E.18
C.E.6
C.E.7
C.E.8
C.L.12
C.L.15
C.L.16
C.L.18
C.L.6
C.L.7
C.L.8
Target description
Achieve or maintain the values and characteristics defined as GES for all descriptors of good environmental status at the boundary of the Strait and Alboran Sea.
Achieve or maintain the values and characteristics defined as GES for all descriptors of good environmental status in the Levantino-Balearic demarcation.
Ensure adequate surveillance of the marine environment through remote or on-site systems. In the second cycle, this objective has been amended to: A.E.10 Ensuring regulatory compliance. This modified objective will be produced as a new one, as the code and indicators have changed.
Ensuring proper surveillance of the marine environment through remote or on-site systems In the second cycle, this objective has been amended to: A.L.10. Ensuring regulatory compliance This modified objective will be produced as a new objective, as the code and indicators have changed.
Ensuring regulatory compliance * Estimation of surveillance in hours * Infringements identified vs sanctions imposed * Human resources available for monitoring and equipment available. OBJECTIVE 2012: A.1.9
Ensuring regulatory compliance * Estimation of surveillance in hours * Infringements identified vs sanctions imposed * Human resources available for monitoring and equipment available. OBJECTIVE 2012: A.1.9
Reduce the volume of direct or indirect discharges without appropriate treatment (industrial discharges, waste water, discharges from rivers, run-off, etc.) into the marine environment, as well as improve the efficiency of sewage treatment stations and sewerage networks to minimise the supply of litter, pollutants and nutrients to the marine environment. In the second cycle, this target has been split into 4: B.E.3.Reducing the input of nutrients, pollutants and litter from river discharges. B.E.4.Reducing the input of nutrients, pollutants and litter from waste water. B.E.5.Reducing the input of nutrients, contaminants and litter from rainy events. B.E.6. Reducing the input of nutrients and contaminants from agricultural activities: Surplus and returns from irrigation and livestock farming, among others. These objectives will be presented as new ones.
Reduce the volume of direct or indirect discharges without appropriate treatment (industrial discharges, waste water, discharges from rivers, run-off, etc.) into the marine environment, as well as improve the efficiency of sewage treatment stations and sewerage networks to minimise the supply of litter, pollutants and nutrients to the marine environment. In the second cycle, this objection has been divided into 4: B.L.3.Reducing the input of nutrients, pollutants and litter from river discharges. B.L.4.Reducing the input of nutrients, pollutants and litter from waste water. B.L.5.Reducing the input of nutrients, contaminants and litter from rainy events. B.L.6. Reducing the input of nutrients and contaminants from agricultural activities: Surplus and returns from irrigation and livestock farming, among others. These objectives will be presented as new objectives.
Reducing the frequency of discharges without proper treatment to the sea from ships and platforms
Reducing the frequency of discharges without proper treatment to the sea from ships and platforms
No superar los niveles de contaminantes establecidos en biota por las autoridades competentes y por los organismos internacionales, y que las tendencias temporales sean decrecientes o permanezcan estables si las concentraciones están lo suficientemente cercanas al nivel basal. En el segundo ciclo, este objetivos se ha unido a otros del primer ciclo en el siguiente objetivo: B.E.2. Identificar y abordar las principales fuentes de contaminantes en el medio marino con el fin de mantener tendencias temporales decrecientes o estables en los niveles de contaminantes en sedimentos y en biota, así como en los niveles biológicos de respuesta a la contaminación en organismos indicadores. Este objetivo se reportará como nuevo, dado que han cambiado el código y los indicadores.
No superar los niveles de contaminantes establecidos en biota por las autoridades competentes y por los organismos internacionales, y que las tendencias temporales sean decrecientes o permanezcan estables si las concentraciones están lo suficientemente cercanas al nivel basal. En el segundo ciclo, este objetivos se ha unido a otros del primer ciclo en el siguiente objetivo: B.L.2. Identificar y abordar las principales fuentes de contaminantes en el medio marino con el fin de mantener tendencias temporales decrecientes o estables en los niveles de contaminantes en sedimentos y en biota, así como en los niveles biológicos de respuesta a la contaminación en organismos indicadores Este objetivo se reportará como nuevo, dado que han cambiado el código y los indicadores
Mantener tendencias temporales decrecientes o estables en los niveles de contaminantes en sedimentos. En el segundo ciclo, este objetivos se ha unido a otros del primer ciclo en el siguiente objetivo: B.E.2. Identificar y abordar las principales fuentes de contaminantes en el medio marino con el fin de mantener tendencias temporales decrecientes o estables en los niveles de contaminantes en sedimentos y en biota, así como en los niveles biológicos de respuesta a la contaminación en organismos indicadores. Este objetivo se reportará como nuevo, dado que han cambiado el código y los indicadores.
Mantener tendencias temporales decrecientes o estables en los niveles de contaminantes en sedimentos. En el segundo ciclo, este objetivos se ha unido a otros del primer ciclo en el siguiente objetivo: B.L.2. Identificar y abordar las principales fuentes de contaminantes en el medio marino con el fin de mantener tendencias temporales decrecientes o estables en los niveles de contaminantes en sedimentos y en biota, así como en los niveles biológicos de respuesta a la contaminación en organismos indicadores Este objetivo se reportará como nuevo, dado que han cambiado el código y los indicadores
No superar los niveles biológicos de respuesta a la contaminación en organismos indicadores para los que existen criterios establecidos por las autoridades competentes y por los organismos internacionales, y que éstos se mantengan dentro de sus rangos de respuestas basales, o se aproximen a este rango, a lo largo del tiempo. En el segundo ciclo, este objetivos se ha unido a otros del primer ciclo en el siguiente objetivo: B.E.2. Identificar y abordar las principales fuentes de contaminantes en el medio marino con el fin de mantener tendencias temporales decrecientes o estables en los niveles de contaminantes en sedimentos y en biota, así como en los niveles biológicos de respuesta a la contaminación en organismos indicadores. Este objetivo se reportará como nuevo, dado que han cambiado el código y los indicadores.
No superar los niveles biológicos de respuesta a la contaminación en organismos indicadores para los que existen criterios establecidos por las autoridades competentes y por los organismos internacionales, y que éstos se mantengan dentro de sus rangos de respuestas basales, o se aproximen a este rango, a lo largo del tiempo. En el segundo ciclo, este objetivos se ha unido a otros del primer ciclo en el siguiente objetivo: B.L.2. Identificar y abordar las principales fuentes de contaminantes en el medio marino con el fin de mantener tendencias temporales decrecientes o estables en los niveles de contaminantes en sedimentos y en biota, así como en los niveles biológicos de respuesta a la contaminación en organismos indicadores. Este objetivo se reportará como nuevo, dado que han cambiado el código y los indicadores
Minimizar la incidencia y magnitud de los eventos significativos de contaminación aguda (por ejemplo, vertidos accidentales de hidrocarburos o productos químicos) y su impacto sobre la biota, a través de procesos adecuados de análisis de riesgos. En el segundo ciclo este objetivo se ha modificado a: B.E.15. Minimizar la incidencia y magnitud de los eventos significativos de contaminación aguda (por ejemplo, vertidos accidentales de hidrocarburos o productos químicos) y su impacto sobre la biota, a través de un adecuado mantenimiento de los sistemas de respuesta. Este objetivo se reportará como nuevo, dado que han cambiado el código y los indicadores
Minimizar la incidencia y magnitud de los eventos significativos de contaminación aguda (por ejemplo, vertidos accidentales de hidrocarburos o productos químicos) y su impacto sobre la biota, a través de procesos adecuados de análisis de riesgos. En el segundo ciclo este objetivo se ha modificado a: B.L.15. Minimizar la incidencia y magnitud de los eventos significativos de contaminación aguda (por ejemplo, vertidos accidentales de hidrocarburos o productos químicos) y su impacto sobre la biota, a través de un adecuado mantenimiento de los sistemas de respuesta. Este objetivo se reportará como nuevo, dado que han cambiado el código y los indicadores
Mejorar el conocimiento de la contaminación presente en el medio marino, así como de los efectos biológicos que se producen en el conjunto de la demarcación, atendiendo a la cobertura espacial, su evolución temporal y a los grupos de contaminantes y efectos biológicos que se consensúen a nivel nacional, regional o europeo. En el segundo ciclo, este objetivo se ha unido a otros para formar el siguiente objetivo de segundo ciclo: B.E.16.Promover que los estudios, iniciativas y proyectos científicos sobre los impactos de la introducción de sustancias, basura y energía en el medio marino, den respuesta a las lagunas de conocimiento detectadas en la Evaluación Inicial y en las sucesivas fases de las Estrategias Marinas. Este objetivo se reportará como nuevo.
Mejorar el conocimiento de la contaminación presente en el medio marino, así como de los efectos biológicos que se producen en el conjunto de la demarcación, atendiendo a la cobertura espacial, su evolución temporal y a los grupos de contaminantes y efectos biológicos que se consensúen a nivel nacional, regional o europeo. En el segundo ciclo, este objetivo se ha unido a otros para formar el siguiente objetivo de segundo ciclo: B.L.16.Promover que los estudios, iniciativas y proyectos científicos sobre los impactos de la introducción de sustancias, basura y energía en el medio marino, dén respuesta a las lagunas de conocimiento detectadas en la Evaluación Inicial y en las sucesivas fases de las Estrategias Marinas. Este objetivo se reportará como nuevo
Reducir la abundancia de plásticos de origen agrícola en el medio costero y marino. • Abundancia de plásticos de procedencia agrícola en estas zonas o playas adyacentes
To minimise the occurrence and magnitude of significant acute pollution events (e.g. accidental discharges of hydrocarbons, chemicals) and their impact on biota, through the proper maintenance of response systems. ? Number of people trained. ? No of courses. ? No of technical working days. ? No. of simulations for maintaining the bases. ? Existence of specific protocols developed. OBJECTIVE 2012: B.2.4
Encourage scientific studies, initiatives and projects on the impacts of the introduction of substances, litter and energy in the marine environment, in response to knowledge gaps identified in the Initial Assessment and in the successive phases of Marine Strategies. ? Awareness building on impacts arising from the introduction of substances, litter and energy in the marine environment, which are addressed by scientific studies and projects. OBJECTIVE 2012: B.3.1, B.3.2, B.3.3 AND B.3.4
Integrate into decision-making and management of the marine environment results and knowledge acquired through studies, initiatives and scientific projects on the impacts of the introduction of substances, litter and energy in the marine environment. * Criteria for evaluating and monitoring the results of scientific projects/studies. * Objectives and management measures for which the design has taken into account the results of scientific projects/studies.
To improve the coordination and standardisation at national level of programmes for monitoring the introduction of substances, waste and energy to the marine environment. • Development of methodologies/common protocols/guidelines. • No of meetings for updating the monitoring programmes. • Development of common access database for the different operators of monitoring programmes.
Identificar y abordar las principales fuentes de contaminantes en el medio marino con el fin de mantener tendencias temporales decrecientes o estables en los niveles de contaminantes en sedimentos y en biota, así como en los niveles biológicos de respuesta a la contaminación en organismos indicadores • Nº /porcentaje de fuentes de contaminación identificadas para las cuales se realizan actuaciones de regulación o reducción. • Niveles y tendencias de contaminantes en sedimentos. • Niveles y tendencias de contaminantes en biota. • Niveles biológicos y tendencias de respuestas biológicas. oBJETIVOS 2012: B.2.1. B.2.2 B.2.3
.Reduce the contribution of nutrients, pollutants and litter from river discharges. ? Deloads of pollutants and nutrients from rivers (volume and pollution load) OBJECTIVES 2012: B.1.1
Reduce the input of nutrients, pollutants and waste from waste water. Urban waste: • Percentage of residents equivalent with point of discharge to coastal waters or estuaries, meeting the requirements of Royal Decree-Law 11/95 and RD 509/1996 (Directive 91/271/EEC) • Percentage of agglomerations discharging directly into coastal and transitional waters satisfying the requirements of RDL 11/95 and RD 509/1996 (Directive 91/271/EEC) Industrial discharges: • Percentage of sewage treatment plants not complying with discharge authorisations according to the Verdes des Verdes OBJECTIVES 2012: B.1.1.
Reducing the inputs of nutrients, pollutants and waste from rain episodes. • Percentage of storm water overflows that are in place with measures put in place to limit the presence of solid and floating reservoirs in storm water overflows or to reduce pollution in storm water overflows. OBJECTIVE 2012: B.1.1
Reducing the contribution of nutrients and pollutants from agriculture: Excess and return on irrigation and livestock use, among others. ? No. of stations that are at risk of the monitoring network for nitrates from agricultural sources in the water bodies of the upstream water category, in transitional waters, in coastal waters and in aquifers or groundwater bodies bordering the coast. OBJECTIVE 2012: B.1.1
To minimise the occurrence and magnitude of significant acute pollution events (e.g. accidental discharges of hydrocarbons, chemicals) and their impact on biota, through the proper maintenance of response systems. ? Number of people trained ? No of courses ? number of technical days ? No of simulations ? No of measures to maintain the bases Existence of specific protocols developed. OBJECTIVES 2012: B.2.4
Encourage scientific studies, initiatives and projects on the impacts of the introduction of substances, litter and energy in the marine environment to address the knowledge gaps identified in the Initial Assessment and in the successive phases of Marine Strategies. * Awareness building on impacts arising from the introduction of substances, litter and energy in the marine environment, which are addressed by scientific studies and projects. OBJECTIVES 2012: B.3.1, B.3.2, B.3.3, B.3.4.
To minimise the occurrence and magnitude of significant acute pollution events (e.g. accidental discharges of hydrocarbons, chemicals) and their impact on biota, through the proper maintenance of response systems. ? Number of people trained. ? No of courses. ? No of technical working days. ? No. of simulations for maintaining the bases. ? Existence of specific protocols developed. OBJECTIVE 2012: B.2.4
Encourage scientific studies, initiatives and projects on the impacts of the introduction of substances, litter and energy in the marine environment, in response to knowledge gaps identified in the Initial Assessment and in the successive phases of Marine Strategies. ? Awareness building on impacts arising from the introduction of substances, litter and energy in the marine environment, which are addressed by scientific studies and projects. OBJECTIVE 2012: B.3.1, B.3.2, B.3.3 AND B.3.4
Integrate into decision-making and management of the marine environment results and knowledge acquired through studies, initiatives and scientific projects on the impacts of the introduction of substances, litter and energy in the marine environment. * Criteria for evaluating and monitoring the results of scientific projects/studies. * Objectives and management measures for which the design has taken into account the results of scientific projects/studies.
To improve the coordination and standardisation at national level of programmes for monitoring the introduction of substances, waste and energy to the marine environment. • Development of methodologies/common protocols/guidelines. • No of meetings for updating the monitoring programmes. • Development of common access database for the different operators of monitoring programmes.
Identificar y abordar las principales fuentes de contaminantes en el medio marino con el fin de mantener tendencias temporales decrecientes o estables en los niveles de contaminantes en sedimentos y en biota, así como en los niveles biológicos de respuesta a la contaminación en organismos indicadores • Nº /porcentaje de fuentes de contaminación identificadas para las cuales se realizan actuaciones de regulación o reducción. • Niveles y tendencias de contaminantes en sedimentos. • Niveles y tendencias de contaminantes en biota. • Niveles biológicos y tendencias de respuestas biológicas. oBJETIVOS 2012: B.2.1. B.2.2 B.2.3
.Reduce the contribution of nutrients, pollutants and litter from river discharges. ? Deloads of pollutants and nutrients from rivers (volume and pollution load) OBJECTIVES 2012: B.1.1
Reduce the input of nutrients, pollutants and waste from waste water. Urban waste: • Percentage of residents equivalent with point of discharge to coastal waters or estuaries, meeting the requirements of Royal Decree-Law 11/95 and RD 509/1996 (Directive 91/271/EEC) • Percentage of agglomerations discharging directly into coastal and transitional waters satisfying the requirements of RDL 11/95 and RD 509/1996 (Directive 91/271/EEC) Industrial discharges: • Percentage of sewage treatment plants not complying with discharge authorisations according to the Verdes des Verdes OBJECTIVES 2012: B.1.1.
Reducing the inputs of nutrients, pollutants and waste from rain episodes. • Percentage of storm water overflows that are in place with measures put in place to limit the presence of solid and floating reservoirs in storm water overflows or to reduce pollution in storm water overflows. OBJECTIVE 2012: B.1.1
Reducing the contribution of nutrients and pollutants from agriculture: Excess and return on irrigation and livestock use, among others. ? No. of stations that are at risk of the monitoring network for nitrates from agricultural sources in the water bodies of the upstream water category, in transitional waters, in coastal waters and in aquifers or groundwater bodies bordering the coast. OBJECTIVE 2012: B.1.1
Ensuring social participation in the Marine Strategy of the demarcation of the Strait and Alboran Sea, through dissemination, awareness raising, voluntary environmental education and involvement of stakeholders in the marine environment. In the second cycle, this objective has remained the same, with the exception of the code: C.E.6. Ensure social participation in the Marine Strategy of the South Atlantic Basin through outreach, awareness-raising, voluntary environmental education and stakeholder involvement in the marine environment. This objective will be produced as a new one, as the code and indicators have changed.
To ensure social participation in the marine strategy of the Levantino-Balearic area through dissemination, awareness-raising, voluntary environmental education and involvement of stakeholders in the marine environment. In the second cycle, this objective has remained the same, with the exception of the code: C.L.6. Ensure social participation in the Marine Strategy of the South Atlantic Basin through outreach, awareness-raising, voluntary environmental education and stakeholder involvement in the marine environment. This objective will be gained as a new objective, given that the code and indicators have changed.
Ensure proper coordination of public administrations, institutions and sectors in the demarcation of the Strait and Alboran Sea, which carry out work related to the marine environment, in such a way as to avoid duplication and exploit synergies. In the second cycle, this objective has been amended to: C.E.7. Achieve proper coordination of public administrations, institutions and sectors in the South Atlantic basin that carry out work related to the marine environment, in such a way as to avoid duplication and exploit synergies. This objective will be produced as a new one, as the code and indicators have changed.
Ensure proper coordination of public administrations, institutions and sectors in the Levantino-Balearic area which carry out work related to the marine environment, in such a way as to avoid duplication and to exploit synergies. In the second cycle, this objective has been amended to: C.L.7. Achieve proper coordination of public administrations, institutions and sectors in the South Atlantic basin that carry out work related to the marine environment, in such a way as to avoid duplication and exploit synergies. This objective will be gained as a new objective, given that the code and indicators have changed.
Improving access to available marine information, in particular with regard to the descriptors of good environmental status, pressures and impacts, and socio-economic aspects, as well as ensuring the quality of this information. In the second cycle, this objective has been amended to: C.E.15. Improving access to available marine information, in particular with regard to the descriptors of good environmental status, pressures and impacts, and socio-economic aspects, as well as ensuring the quality of this information for both administrations and institutions related to the sea, and for the general public. This objective will be produced as a new one, as the code and indicators have changed.
Improving access to available marine information, in particular with regard to the descriptors of good environmental status, pressures and impacts, and socio-economic aspects, as well as ensuring the quality of this information. In the second cycle, this objective has been amended to: C.L.15. Improving access to available marine information, in particular with regard to the descriptors of good environmental status, pressures and impacts, and socio-economic aspects, as well as ensuring the quality of this information for both administrations and institutions related to the sea, and for the general public. This objective will be produced as a new one, as the code and indicators have changed.
Increase awareness of the impact of human activities on habitats, especially biogenic and protected species, their species, populations and communities, their sensitivity, tolerance limits and acclimatisation and acclimatisation, especially in relation to fishing activities, infrastructure construction, dredging, extraction of non-renewable marine resources, pollution and interaction with the effects of climate change (acidification, heating, etc.). In the second cycle, this objective has been split into two: C.E.16. Encourage scientific studies and projects to respond to knowledge gaps identified in the initial assessment on the impact of human activities on marine and coastal ecosystems. C.E.17. Improving knowledge on the effects of climate change on marine and coastal ecosystems, with a view to mainstreaming cross-cutting issues
Increase awareness of the impact of human activities on habitats, especially biogenic and protected species, their species, populations and communities, their sensitivity, tolerance limits and acclimatisation and acclimatisation, especially in relation to fishing activities, infrastructure construction, dredging, extraction of non-renewable marine resources, pollution and interaction with the effects of climate change (acidification, heating, etc.). In the second cycle, this objective has been split into two: C.L.16. Encourage scientific studies and projects to respond to knowledge gaps identified in the initial assessment on impact of human activities on marine and coastal ecosystems C.L.17. Improving knowledge on the effects of climate change in marine and coastal ecosystems, with a view to cross-cutting mainstreaming climate change variable in all phases of Marine Strategies
Measures on stretches of coastline where permanent physical alterations caused by human activities have caused a significant impact so as to be compatible with the good environmental status of the seabed and hydrographical conditions. • No of measures taken in respect of each activity causing significant impact OBJECTIVE 2012: C.2.3
Improving access to available marine information, in particular with regard to the descriptors of good environmental status, pressures and impacts, and socio-economic aspects, as well as ensuring the quality of this information for both administrations and institutions related to the sea, and for the general public. • Existence of platforms for access and exchange of information on the marine environment which facilitate the management of public administrations • Means of access and quality of marine environment information available to citizens • Number of metadata available OBJECTIVE C.3.1
Encourage scientific studies and projects to address knowledge gaps identified in the initial assessment of the impact of human activities on marine and coastal ecosystems. * No. of studies and scientific projects promoted by public administrations dealing with these subjects. * Knowledge-based studies and scientific projects. OBJECTIVE 2012: C.3.5
Integrate into decision-making and management of the marine environment results and knowledge acquired through scientific studies, initiatives and projects on the impact of human activities on habitats, species, populations and communities * Criteria for evaluation and monitoring of the results of scientific projects/studies (based on the references in documents) * Objectives and management measures for which the design has taken into account the results of scientific projects/studies
Ensuring social participation in the marine strategy of the Strait and Alboran area through initiatives for dissemination, awareness-raising, voluntary environmental education and involvement of stakeholders in the marine environment. * Number of initiatives for social participation and evaluation of their results OBJECTIVE 2012: C.1.3
Ensuring proper coordination of public administrations, institutions and sectors in the Strait and Alboran area who carry out work related to the marine environment, in such a way as to avoid duplication and to exploit synergies. * Number of initiatives, projects and coordination meetings * Thematic areas in which coordination initiatives are taken OBJECTIVE 2012: C.1.4
Promote, through the Maritime Spatial Plan of the Strait and Alboran area, or other development tools, that human activities take place in a sustainable manner and do not jeopardise the achievement of the Good Environmental Status. * Number of human activities covered by the management plan OBJECTIVE 2012: C1.5
Measures on stretches of coastline where permanent physical alterations caused by human activities have caused a significant impact so as to be compatible with the good environmental status of the seabed and hydrographical conditions. • No of measures taken in respect of each activity causing significant impact OBJECTIVE 2012: C.2.3
Improving access to available marine information, in particular with regard to the descriptors of good environmental status, pressures and impacts, and socio-economic aspects, as well as ensuring the quality of this information for both administrations and institutions related to the sea, and for the general public. • Existence of platforms for access and exchange of information on the marine environment which facilitate the management of public administrations • Means of access and quality of marine environment information available to citizens • Number of metadata available OBJECTIVE C.3.1
Encourage scientific studies and projects to address knowledge gaps identified in the initial assessment of the impact of human activities on marine and coastal ecosystems. * No. of studies and scientific projects promoted by public administrations dealing with these subjects. * Knowledge-based studies and scientific projects. OBJECTIVE 2012: C.3.5
Integrate into decision-making and management of the marine environment results and knowledge acquired through scientific studies, initiatives and projects on the impact of human activities on habitats, species, populations and communities * Criteria for evaluation and monitoring of the results of scientific projects/studies (based on the references in documents) * Objectives and management measures for which the design has taken into account the results of scientific projects/studies
To ensure social participation in the marine strategy of the Levantino-Balearic area through dissemination, awareness-raising, voluntary environmental education and involvement of stakeholders in the marine environment. * Number of initiatives for social participation and evaluation of their results OBJECTIVE 2012: C.1.3
Ensure proper coordination of public administrations, institutions and sectors in the Levantino-Balearic area which carry out work related to the marine environment, in such a way as to avoid duplication and to exploit synergies. * Number of initiatives, projects and coordination meetings * Thematic areas in which coordination initiatives are taken OBJECTIVE 2012: C.1.4
Promote, through the Maritime Spatial Plan of the Levantino-Balearic Area and/or other development tools, that human activities be developed in a sustainable manner and do not jeopardise the achievement of the Good Environmental Status. * Number of human activities covered by the management plan OBJECTIVE 2012: C1.5
Feature(s)
  • All marine ecosystem elements
  • All marine ecosystem elements
  • All marine ecosystem elements
  • All pressures
  • All marine ecosystem elements
  • All pressures
  • All marine ecosystem elements
  • All marine ecosystem elements
  • Eutrophication
  • Input of litter (solid waste matter, including micro-sized litter)
  • Input of nutrients - diffuse sources, point sources, atmospheric deposition
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Eutrophication
  • Input of litter (solid waste matter, including micro-sized litter)
  • Input of nutrients - diffuse sources, point sources, atmospheric deposition
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input of litter (solid waste matter, including micro-sized litter)
  • Acute pollution events
  • All pressures related to inputs of substances, litter and energy
  • All pressures related to inputs of substances, litter and energy
  • All pressures related to inputs of substances, litter and energy
  • All pressures related to inputs of substances, litter and energy
  • All pressures related to inputs of substances, litter and energy
  • All pressures related to inputs of substances, litter and energy
  • Input of litter (solid waste matter, including micro-sized litter)
  • Input of nutrients - diffuse sources, point sources, atmospheric deposition
  • Input of organic matter - diffuse sources and point sources
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input of nutrients - diffuse sources, point sources, atmospheric deposition
  • Input of organic matter - diffuse sources and point sources
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Acute pollution events
  • All marine ecosystem elements
  • Acute pollution events
  • All pressures related to inputs of substances, litter and energy
  • All pressures related to inputs of substances, litter and energy
  • All pressures related to inputs of substances, litter and energy
  • All pressures related to inputs of substances, litter and energy
  • All pressures related to inputs of substances, litter and energy
  • All pressures related to inputs of substances, litter and energy
  • Input of litter (solid waste matter, including micro-sized litter)
  • Input of nutrients - diffuse sources, point sources, atmospheric deposition
  • Input of organic matter - diffuse sources and point sources
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input of nutrients - diffuse sources, point sources, atmospheric deposition
  • Input of organic matter - diffuse sources and point sources
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • All marine ecosystem elements
  • All marine ecosystem elements
  • All marine ecosystem elements
  • All marine ecosystem elements
  • All marine ecosystem elements
  • All marine ecosystem elements
  • Benthic habitats
  • Changes to hydrological conditions
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Physical disturbance to seabed
  • Benthic habitats
  • Changes to hydrological conditions
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Physical disturbance to seabed
  • All activities
  • All marine ecosystem elements
  • All marine ecosystem elements
  • All marine ecosystem elements
  • All marine ecosystem elements
  • All marine ecosystem elements
  • All marine ecosystem elements
  • All activities
  • All marine ecosystem elements
  • All marine ecosystem elements
  • All marine ecosystem elements
  • All marine ecosystem elements
  • All marine ecosystem elements
  • All marine ecosystem elements
GES components
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D10
  • D5
  • D8
  • D9
  • D10
  • D5
  • D8
  • D9
  • D8
  • D9
  • D8
  • D9
  • D8
  • D8
  • D8
  • D8
  • D8
  • D8
  • D8
  • D8
  • D8
  • D8
  • D8
  • D8
  • D10
  • D11
  • D5
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D10
  • D11
  • D5
  • D8
  • D9
  • D8
  • D5
  • D8
  • D10
  • D5
  • D8
  • D10
  • D5
  • D8
  • D5
  • D8
  • D8
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D8
  • D10
  • D11
  • D5
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D10
  • D11
  • D5
  • D8
  • D9
  • D8
  • D5
  • D8
  • D10
  • D5
  • D8
  • D10
  • D5
  • D8
  • D5
  • D8
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D6
  • D8
  • D1
  • D10
  • D6
  • D8
  • D1
  • D4
  • D7
  • D8
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D4
  • D7
  • D8
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
  • D1
  • D10
  • D11
  • D2
  • D3
  • D4
  • D5
  • D6
  • D7
  • D8
  • D9
Timescale
202012
202012
202012
202012
202412
202412
202012
202012
202012
202012
202012
202012
202012
202012
202012
202012
202012
202012
202012
202012
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
202012
202012
202012
202012
202012
202012
202012
202012
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
202412
Update date
201211
201211
201211
201211
201907
201907
201211
201211
201211
201211
201211
201211
201211
201211
201211
201211
201211
201211
201211
201211
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
201211
201211
201211
201211
201211
201211
201211
201211
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
201907
Update type
Target no longer needed
Target no longer needed
Modified from 2012 definition
Modified from 2012 definition
New target
New target
Modified from 2012 definition
Modified from 2012 definition
Target no longer needed
Target no longer needed
Modified from 2012 definition
Modified from 2012 definition
Modified from 2012 definition
Modified from 2012 definition
Modified from 2012 definition
Modified from 2012 definition
Modified from 2012 definition
Modified from 2012 definition
Modified from 2012 definition
Modified from 2012 definition
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
Modified from 2012 definition
Modified from 2012 definition
Modified from 2012 definition
Modified from 2012 definition
Modified from 2012 definition
Modified from 2012 definition
Modified from 2012 definition
Modified from 2012 definition
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
New target
Marine reporting unit
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-ES-SD-LEV
  • MWE-ES-SD-LEV
  • MWE-ES-SD-LEV
  • MWE-ES-SD-LEV
  • MWE-ES-SD-LEV
  • MWE-ES-SD-LEV
  • MWE-ES-SD-LEV
  • MWE-ES-SD-LEV
  • MWE-ES-SD-LEV
  • MWE-ES-SD-LEV
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-ES-SD-LEV
  • MWE-ES-SD-LEV
  • MWE-ES-SD-LEV
  • MWE-ES-SD-LEV
  • MWE-ES-SD-LEV
  • MWE-ES-SD-LEV
Element
metales pesados Hg, Cd, y Pb, PAH, PBDEs, PCBs y p
metales pesados Hg, Cd, y Pb, PAH, PBDEs, PCBs y p
Metales pesados, compuestos organoclorados, hidroc
Metales pesados, compuestos organoclorados, hidroc
Mejillón
Mejillón
Element 2
Salmonete
Salmonete
Parameter
Other
Other
Other
Other
Other
Other
Incidence
Incidence
Concentration in biota
Concentration in biota
Concentration in sediment
Concentration in sediment
Incidence
Incidence
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
Parameter - other
All parameters
All parameters
Existence of surveillance systems
Existence of surveillance systems
Volume
Volume
Risk analysis
Risk analysis
The existence of studies
The existence of studies
Social participation initiatives
Social participation initiatives
Coordination actions
Coordination actions
Degree of access
Degree of access
Number of studies
Number of studies
Target value
Value achieved - upper
Value achieved - lower
Value unit
Value unit - other
Target status
Target not yet achieved
Target not yet achieved
Target achieved
Target achieved
Target achieved
Target achieved
Target achieved
Target achieved
Assessment period
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
2012-2018
Target assessment description
(SEE 9 GES reporting for the different arbitrators) objective 0 is considered unnecessary since it coincides with the main aim of the Directive: Achieve BEA in all descriptors
(SEE 9 GES reporting for the different arbitrators) objective 0 is considered unnecessary since it coincides with the main aim of the Directive: Achieve BEA in all descriptors
Progress was noted. Active surveillance systems exist on the ground, although the monitoring of protected areas of protected areas (EMP) is to be completed. There are also remote surveillance systems such as buoys, satellites, radio-positioning of vessels by radio (AIS) and satellite (VMS), etc. It is proposed to change the target in order to focus more on monitoring compliance with the established rules, with a view to protecting marine ecosystems. Modify indicators to provide information on the degree of surveillance carried out, such as the number of infringement files, surveillance hours or the human resources allocated for this purpose.
Progress was noted. There are systems in situ active surveillance, however it is planned to complete the monitoring of Protected marine areas (EMP) Surveillance systems also exist remote, such as buoys, satellites, geolocalisation of vessels, by radio (AIS) and satellite (VMS) etc It is proposed to change the objective of focus more on the monitoring compliance rules laid down in the interest of the ecosystem protection seafarers Edit indicator to provide input information on the grade of surveillance performed, such as number of infringement dossiers, surveillance or human resources intended for the purpose
The objective and indicator are complex to measure, given that discharges without proper treatment do not have an authorisation, and therefore there is no data on them. It is considered to be the most important objective of block B and that it would be appropriate to split it into a number of objectives according to origin. The indicators have also been consulted on the alignment of the indicators.
The objective and indicator are complex to measure, given that discharges without proper treatment are not authorised and therefore no data are available. It is considered to be the most important objective of block B and that it would be appropriate to split it into a number of objectives according to origin. The indicators have also been consulted for the adaptation of the indicators.
No es posible obtener información sobre el indicador, dado que este tipo de vertidos no cuentan con autorización. Eliminar objetivo e indicador, puesto que no se pueden medir, y el efecto se mide a través de los Descriptores D5, D8, D10.
It is not possible to obtain information on the indicator, since such discharges do not have an authorisation. Delete objective and indicator as they cannot be measured, and the effect is measured via Descriptors D5, D8, D10
Se detectan progresos. Ver evaluación inicial D8. Se propone unir a los objetivos B.2.2. Y B.2.3, dado que las presiones causantes de los niveles de contaminantes en las distintas matrices y en las respuestas biológicas son las mismas.
see art9 GES reporting for D8 Se detectan progresos. Según la actualización de la evaluación del D8, por lo general los resultados presentan una mejora con respecto a la evaluación del 2012. Sin embargo en algunos casos se superan los valores de referencia, por lo que no se puede concluir que el objetivo se haya cumplido. Ver evaluación inicial D8 Se propone unir a los objetivos B.2.2. Y B.2.3, dado que las presiones causantes de los niveles de contaminantes en las distintas matrices y en las respuestas biológicas son las mismas Se propone añadir al objetivo la identificación de las presiones relacionadas y abordarlas, y unificar así ambos criterios en un solo objetivo de presión
see art9 GES reporting for D8. Los niveles de determinados contaminantes en sedimento han aumentado con respecto al 2012. Ver evaluación inicial D8. Ver Objetivo B.2.1.
see art9 GES reporting for D8 Los niveles de determinados contaminantes en sedimento, como la de PAHs, han aumentado con respecto al 2012 Ver evaluación inicial D8
see art9 GES reporting for D8. Aunque se detectan progresos, se superan algunos niveles biológicos de respuesta, de forma que se detectan posibles efectos negativos en organismos por exposición a determinados contaminantes. Ver evaluación inicial D8C2. Ver Objetivo B.2.1
see art9 GES reporting for D8 Se superan algunos niveles biológicos de respuesta, de forma que se detectan posibles efectos negativos en organismos por exposición a determinados contaminantes
The manufacturing works of the Ribera plan comprise an in-depth study which includes a detailed risk analysis. The target is met, but the maintenance of response systems needs to be ensured. It is proposed to amend it to include the maintenance of response systems for these events.
The construction work for the Ribera plan comprises an in-depth study including a detailed risk analysis. The target is met, but the maintenance of response systems needs to be ensured. It is proposed to amend it to include the maintenance of response systems for these events.
This cannot be assessed in the absence of information from scientific bodies and universities. In order to simplify, it is proposed to combine all the objectives of increasing knowledge with the following unitary objective: ?scientific studies and projects address knowledge gaps identified in IA?.
It is not possible to assess, in the absence of information from scientific bodies and universities. In order to simplify, it is proposed to join all the objectives for the increase of knowledge in the following unit objective: ?Scientific studies and projects address the knowledge gaps identified in the IS?
Objective achieved: Expert PdS workshops: 14 (Workshops and meetings with administrations and survey) Expert workshop for the design of the MIP: 21 • Dissemination: 1 workshop (by DM), 1 Dissemination campaign (dissemination materials) • 2 CONAMAS • Education and participation projects: 22 (BIO) including INTEMARES • Volunteering: • Meetings with sectors: 1 workshop on socio-economic analysis • Public consultation of documents from the Member States: 3 It is proposed to keep this objective for the second cycle, so as to ensure social participation in the Member States.
Objective achieved: Expert Workshops on PoS: 14 (Workshops and meetings with administrations and survey) Design experts workshop MIP: 21 — Dissemination: 1 workshop (by DM), 1 Material campaign (materials) informative) 2 CONAMAS Education projects and participation: 22 (FBIO) including INTEMARES Voluntary campaigns: Meetings with sectors: 1 workshop on socio-economic analysis Public consultation of documents Member States: 3 It is proposed to maintain this target for the second cycle, to ensure participation social in Member States
Target achieved • ICES meetings: 6 • Follow-up Committee meetings ESAL 6 • Autonomous Community meetings on marine biodiversity: 5 • DMESAL data flow establishment • working groups: WG Biodiversity: 1 Marine cartography: 10 Descriptor 9 GT: 1 WG Seat-Data: 2 WG Technical WG Costa: 6 • meetings with sectors: 1 workshop on socio-economic analysis It is proposed to maintain the objective, by improving the wording for the second cycle, to make further progress in the coordination of public administrations. It is proposed to add as indicator: “Number of thematic areas in which coordination initiatives are taken, compared to the previous cycle”.
Target achieved ICES meetings: 6 Committee meetings of LEBA monitoring: 6 Communities meetings regions on biodiversity marine: 16 Establishment of the flow rate of DMALBA data Working groups: WG Biodiversity: 1 Marine cartography: 10 Descriptor 9 GT: 1 WG Seat-Data: 2 WG Technical WG Costa: 6 Meetings with sectors: 1 workshop on socio-economic analysis It is proposed to maintain the objective. By improving the wording for the second cycle, to make further progress on coordination of general government It is proposed to add as follows: indicator: “number of thematic areas in which take initiatives of coordination with regard to previous cycle”
Target achieved All Member State documents are publicly available on MITECO’s website. However, it can be improved. For the second cycle, it is proposed to specify and extend the target audience, so as to improve access to information on the marine environment available to all maritime administrations and institutions, as well as to the general public.
Target achieved All Member State documents are publicly available on MITECO's website However, it can be improved. For the second cycle, it is proposed to specify and extend the target audience, so as to improve access to information on the marine environment available to all maritime administrations and institutions, as well as to the general public.
Progress was noted. In order to simplify, it is proposed to join all the objectives for the increase of knowledge in the following unit objective: “studies and scientific projects address the knowledge gaps identified in the IA”. Of this objective, it is proposed to keep the improvement of knowledge on the effects of climate change on the marine environment separately and to incorporate the intention to consider this variable in the different phases of marine strategies.
Progress was noted. In order to simplify, it is proposed to join all the objectives for the increase of knowledge in the following unit objective: “Scientific studies and projects address the knowledge gaps identified in the IS” Of this objective, it is proposed to keep the improvement of knowledge on the effects of climate change on the marine environment separately and to incorporate the intention to consider this variable in the different phases of marine strategies.
Related indicator
  • 00
  • CONT-MET-S
  • CONT-PAH-S
  • CONT-PCB-S
  • CONT-MET-S
  • CONT-PAH-S
  • CONT-PCB-S
Related measures
  • Todas las medidas
  • todas las medidas
  • EC7
  • EMP10
  • EMP2
  • EMP3
  • H1
  • EC7
  • EMP10
  • EMP2
  • EMP3
  • H1
  • BM28
  • CONT4
  • H1
  • BM28
  • CONT4
  • H1
  • H1
  • H13
  • H1
  • H13
  • H6
  • BIO36
  • BIO46
  • CONT4
  • CONT5
  • H1
  • H13
  • BIO36
  • BIO46
  • CONT4
  • CONT5
  • H1
  • H13
  • H6
  • BIO36
  • BIO46
  • CONT4
  • CONT5
  • H1
  • H13
  • BIO36
  • BIO46
  • CONT4
  • CONT5
  • H1
  • H13
  • H6
  • BIO36
  • BIO46
  • CONT4
  • CONT5
  • H1
  • H13
  • BIO36
  • BIO46
  • CONT4
  • CONT5
  • H1
  • H13
  • H6
  • CONT1
  • CONT12
  • CONT13
  • CONT2
  • CONT3
  • CONT7
  • CONT 1
  • CONT12
  • CONT13
  • CONT2
  • CONT3
  • CONT7
  • CONT14
  • CONT14.
  • BIO12
  • BM14
  • EAI3
  • EC5
  • EMP11
  • EMP9
  • H10
  • H11
  • H12
  • H13
  • H14
  • H2
  • H4
  • BIO12
  • BM24
  • EAI3
  • EC5
  • EMP11
  • EMP9
  • H10
  • H11
  • H12
  • H13
  • H14
  • H2
  • H4
  • BIO6
  • CONT1
  • CONT12
  • EC4
  • H10
  • H12
  • BIO6
  • CONT1
  • CONT12
  • EC4
  • H10
  • H12
  • H6
  • H10
  • H12
  • H10
  • H12
  • H6
  • BIO15
  • BIO20
  • BM23
  • H1
  • RS1
  • BIO15
  • BIO20
  • BM23
  • H1
  • RS1