Member State report / Art8 / 2018 / D7 / Italy / Mediterranean: Ionian Sea & Central Mediterranean Sea

Report type Member State report to Commission
MSFD Article Art. 8 Initial assessment (and Art. 17 updates)
Report due 2018-10-15
GES Descriptor D7 Hydrographical changes
Member State Italy
Region/subregion Mediterranean: Ionian Sea & Central Mediterranean Sea
Reported by ISPRA - Italian National Institute for Environmental Protection and Research
Report date 2020-10-01
Report access MSFD_2018_ART8_GES_IT_2020-07-31.xml

Ionian Sea and Central Mediterranean Sea (IT-ISCMS-0001)

GES component
D7
D7
D7
D7
D7
D7
Feature
Hydrographical changes
Benthic broad habitats
Benthic broad habitats
Benthic broad habitats
Benthic broad habitats
Other benthic habitats
Element
Infralittoral rock and biogenic reef
Infralittoral sand
Littoral rock and biogenic reef
Littoral sediment
Posidonia beds (Posidonion oceanicae)
Element code
HabBenInfralitRock
HabBenInfralitSand
HabBenLitRock
HabBenLitSed
1120
Element code source
Habitats (D1-D6) http://dd.eionet.europa.eu/vocabulary/msfd/broadHabitatTypes/view
Habitats (D1-D6) http://dd.eionet.europa.eu/vocabulary/msfd/broadHabitatTypes/view
Habitats (D1-D6) http://dd.eionet.europa.eu/vocabulary/msfd/broadHabitatTypes/view
Habitats (D1-D6) http://dd.eionet.europa.eu/vocabulary/msfd/broadHabitatTypes/view
Habitats (D1-D6) http://dd.eionet.europa.eu/vocabulary/biodiversity/n2000habitats/view
Element 2
Element 2 code
Element 2 code source
Element source
EU
EU
EU
EU
BARCON
Criterion
D7C1
D7C2
D7C2
D7C2
D7C2
D7C2
Parameter
Extent
Habitat condition
Habitat condition
Habitat condition
Habitat condition
Habitat condition
Parameter other
Threshold value upper
5.0
5.0
5.0
5.0
5.0
5.0
Threshold value lower
Threshold qualitative
Threshold value source
National
National
National
National
National
National
Threshold value source other
Value achieved upper
0.03
0.03
0.03
0.03
0.03
0.03
Value achieved lower
Value unit
Other
Other
Other
Other
Other
Other
Value unit other
percentage
percentage
percentage
percentage
percentage
persentage
Proportion threshold value
Proportion value achieved
99.97
99.97
99.97
99.97
99.97
99.97
Proportion threshold value unit
% area of MRU achieving threshold value
% area of habitat achieving threshold value
% area of habitat achieving threshold value
% area of habitat achieving threshold value
% area of habitat achieving threshold value
% area of habitat achieving threshold value
Trend
Stable
Stable
Stable
Stable
Stable
Stable
Parameter achieved
Yes
Yes
Yes
Yes
Yes
Yes
Description parameter
Related indicator
  • IT-MSFD-2018-D7-INFRA
  • IT-MSFD-2018-D7-INFRA
  • IT-MSFD-2018-D7-INFRA
  • IT-MSFD-2018-D7-INFRA
  • IT-MSFD-2018-D7-INFRA
  • IT-MSFD-2018-D7-INFRA
Criteria status
Good
Good
Good
Good
Good
Good
Description criteria
Element status
Good
Good
Good
Good
Good
Description element
Integration rule type parameter
Not relevant
Not relevant
Not relevant
Not relevant
Not relevant
Not relevant
Integration rule description parameter
Integration rule type criteria
Integration rule description criteria
GES extent threshold
GES extent achieved
GES extent unit
GES achieved
GES achieved
GES achieved
GES achieved
GES achieved
GES achieved
GES achieved
Description overall status
MS Italy has developed a national specific monitoring programme under the project EcAp-ICZM, to survey planned, developing or realized after 2012 marine and coastal infrastructures requiring a national EIA procedure. For one infrastructure, Terminale GNL to be realized in Monfalcone Port in Adriatic Sea, a specific monitoring programme has been implemented and results have been used to develop a methodological guidance for future monitoring and assessment for D7. Furthermore, during the period 2012-2018, monitoring data on background oceanographical characteristic and features have been collected and analyzed at sub-regional scale in order to identify natural variability trend against which permanent hydrographical modifications due to infrastructures have been assessed. GES for D7 is considered to be achieved based on GES definition adopted in 2012 and future monitoring programme will include multi-pressure analysis due to marine and coastal infrastructures.
MS Italy has developed a national specific monitoring programme under the project EcAp-ICZM, to survey planned, developing or realized after 2012 marine and coastal infrastructures requiring a national EIA procedure. For one infrastructure, Terminale GNL to be realized in Monfalcone Port in Adriatic Sea, a specific monitoring programme has been implemented and results have been used to develop a methodological guidance for future monitoring and assessment for D7. Furthermore, during the period 2012-2018, monitoring data on background oceanographical characteristic and features have been collected and analyzed at sub-regional scale in order to identify natural variability trend against which permanent hydrographical modifications due to infrastructures have been assessed. GES for D7 is considered to be achieved based on GES definition adopted in 2012 and future monitoring programme will include multi-pressure analysis due to marine and coastal infrastructures.
MS Italy has developed a national specific monitoring programme under the project EcAp-ICZM, to survey planned, developing or realized after 2012 marine and coastal infrastructures requiring a national EIA procedure. For one infrastructure, Terminale GNL to be realized in Monfalcone Port in Adriatic Sea, a specific monitoring programme has been implemented and results have been used to develop a methodological guidance for future monitoring and assessment for D7. Furthermore, during the period 2012-2018, monitoring data on background oceanographical characteristic and features have been collected and analyzed at sub-regional scale in order to identify natural variability trend against which permanent hydrographical modifications due to infrastructures have been assessed. GES for D7 is considered to be achieved based on GES definition adopted in 2012 and future monitoring programme will include multi-pressure analysis due to marine and coastal infrastructures.
MS Italy has developed a national specific monitoring programme under the project EcAp-ICZM, to survey planned, developing or realized after 2012 marine and coastal infrastructures requiring a national EIA procedure. For one infrastructure, Terminale GNL to be realized in Monfalcone Port in Adriatic Sea, a specific monitoring programme has been implemented and results have been used to develop a methodological guidance for future monitoring and assessment for D7. Furthermore, during the period 2012-2018, monitoring data on background oceanographical characteristic and features have been collected and analyzed at sub-regional scale in order to identify natural variability trend against which permanent hydrographical modifications due to infrastructures have been assessed. GES for D7 is considered to be achieved based on GES definition adopted in 2012 and future monitoring programme will include multi-pressure analysis due to marine and coastal infrastructures.
MS Italy has developed a national specific monitoring programme under the project EcAp-ICZM, to survey planned, developing or realized after 2012 marine and coastal infrastructures requiring a national EIA procedure. For one infrastructure, Terminale GNL to be realized in Monfalcone Port in Adriatic Sea, a specific monitoring programme has been implemented and results have been used to develop a methodological guidance for future monitoring and assessment for D7. Furthermore, during the period 2012-2018, monitoring data on background oceanographical characteristic and features have been collected and analyzed at sub-regional scale in order to identify natural variability trend against which permanent hydrographical modifications due to infrastructures have been assessed. GES for D7 is considered to be achieved based on GES definition adopted in 2012 and future monitoring programme will include multi-pressure analysis due to marine and coastal infrastructures.
MS Italy has developed a national specific monitoring programme under the project EcAp-ICZM, to survey planned, developing or realized after 2012 marine and coastal infrastructures requiring a national EIA procedure. For one infrastructure, Terminale GNL to be realized in Monfalcone Port in Adriatic Sea, a specific monitoring programme has been implemented and results have been used to develop a methodological guidance for future monitoring and assessment for D7. Furthermore, during the period 2012-2018, monitoring data on background oceanographical characteristic and features have been collected and analyzed at sub-regional scale in order to identify natural variability trend against which permanent hydrographical modifications due to infrastructures have been assessed. GES for D7 is considered to be achieved based on GES definition adopted in 2012 and future monitoring programme will include multi-pressure analysis due to marine and coastal infrastructures.
Assessments period
2012-2017
2012-2017
2012-2017
2012-2017
2012-2017
2012-2017
Related pressures
  • Changes to hydrological conditions
  • Changes to hydrological conditions
  • Changes to hydrological conditions
  • Changes to hydrological conditions
  • Changes to hydrological conditions
  • Changes to hydrological conditions
Related targets
  • T 7.1
  • T 7.1
  • T 7.1
  • T 7.1
  • T 7.1
  • T 7.1