Member State report / Art11 / 2014-2020 / D1-B / Latvia / Baltic Sea
Report type | Member State report to Commission |
MSFD Article | Art. 11 Monitoring programmes (and Art. 17 updates) |
Report due | 2014-10-15; 2020-10-15 |
GES Descriptor | D1 Birds |
Member State | Latvia |
Region/subregion | Baltic Sea |
Reported by | Latvian Institute of Aquatic Ecology |
Report date | 2014-12-05; 2021-06-09 |
Report access |
2014 data
2020 data
Monitoring programme | Monitoring programme name | MP_D2 |
MP_D2 |
MP_D2 |
MP_D2 |
MP_D2 |
MP_D2 |
MP_D2 |
MP_D5 |
MP_D5 |
MP_D5 |
MP_D5 |
MP_D5 |
MP_D5 |
MP_D5 |
MP_D5 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Monitoring programme | Reference existing programme | |||||||||||||||
Monitoring programme | Marine Unit ID | |||||||||||||||
Q4e - Programme ID | BAL-LV-2014 |
BAL-LV-2014 |
BAL-LV-2014 |
BAL-LV-2014 |
BAL-LV-2014 |
BAL-LV-2014 |
BAL-LV-2014 |
BAL-LV-2014 |
BAL-LV-2014 |
BAL-LV-2014 |
BAL-LV-2014 |
BAL-LV-2014 |
BAL-LV-2014 |
BAL-LV-2014 |
BAL-LV-2014 |
|
Q4f - Programme description | The monitoring programme is incomplete at the present stage due to lack of knowledge and severe limitation in indicator availability. Therefore, balance between parts of the monitoring programme can not be assessed. |
The monitoring programme is incomplete at the present stage due to lack of knowledge and severe limitation in indicator availability. Therefore, balance between parts of the monitoring programme can not be assessed. |
The monitoring programme is incomplete at the present stage due to lack of knowledge and severe limitation in indicator availability. Therefore, balance between parts of the monitoring programme can not be assessed. |
The monitoring programme is incomplete at the present stage due to lack of knowledge and severe limitation in indicator availability. Therefore, balance between parts of the monitoring programme can not be assessed. |
The monitoring programme is incomplete at the present stage due to lack of knowledge and severe limitation in indicator availability. Therefore, balance between parts of the monitoring programme can not be assessed. |
The monitoring programme is incomplete at the present stage due to lack of knowledge and severe limitation in indicator availability. Therefore, balance between parts of the monitoring programme can not be assessed. |
The monitoring programme is incomplete at the present stage due to lack of knowledge and severe limitation in indicator availability. Therefore, balance between parts of the monitoring programme can not be assessed. |
The monitoring programme is incomplete at the present stage due to lack of knowledge and severe limitation in indicator availability. Therefore, balance between parts of the monitoring programme can not be assessed. |
||||||||
Q5e - Natural variability |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Q5d - Adequacy for assessment of GES | Q5d - Adequate data | N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Q5d - Adequacy for assessment of GES | Q5d - Established methods | N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Q5d - Adequacy for assessment of GES | Q5d - Adequate understanding of GES | N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Q5d - Adequacy for assessment of GES | Q5d - Adequate capacity | N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Q5f - Description of programme for GES assessment | There is a linkage between sub-programmes and descriptors provided in monitoring programme. However, the monitoring programme at present stage is incomplete due to lack of knowledge and correspondingly insufficient number of available indicators. At this time there is no or only very few indicators for descriptors 1, 4 and 6. Some ongoing work will result in HELCOM CORE set indicators for biodiversity that would be used for D1. However, indicator description is not yet finished. Therefore, it is not possible to assess how well adopted monitoring programme will contribute to assessment needs by use of developed indicators. Consequently, the need to amend monitoring programme is already foreseen. |
There is a linkage between sub-programmes and descriptors provided in monitoring programme. However, the monitoring programme at present stage is incomplete due to lack of knowledge and correspondingly insufficient number of available indicators. At this time there is no or only very few indicators for descriptors 1, 4 and 6. Some ongoing work will result in HELCOM CORE set indicators for biodiversity that would be used for D1. However, indicator description is not yet finished. Therefore, it is not possible to assess how well adopted monitoring programme will contribute to assessment needs by use of developed indicators. Consequently, the need to amend monitoring programme is already foreseen. |
There is a linkage between sub-programmes and descriptors provided in monitoring programme. However, the monitoring programme at present stage is incomplete due to lack of knowledge and correspondingly insufficient number of available indicators. At this time there is no or only very few indicators for descriptors 1, 4 and 6. Some ongoing work will result in HELCOM CORE set indicators for biodiversity that would be used for D1. However, indicator description is not yet finished. Therefore, it is not possible to assess how well adopted monitoring programme will contribute to assessment needs by use of developed indicators. Consequently, the need to amend monitoring programme is already foreseen. |
There is a linkage between sub-programmes and descriptors provided in monitoring programme. However, the monitoring programme at present stage is incomplete due to lack of knowledge and correspondingly insufficient number of available indicators. At this time there is no or only very few indicators for descriptors 1, 4 and 6. Some ongoing work will result in HELCOM CORE set indicators for biodiversity that would be used for D1. However, indicator description is not yet finished. Therefore, it is not possible to assess how well adopted monitoring programme will contribute to assessment needs by use of developed indicators. Consequently, the need to amend monitoring programme is already foreseen. |
There is a linkage between sub-programmes and descriptors provided in monitoring programme. However, the monitoring programme at present stage is incomplete due to lack of knowledge and correspondingly insufficient number of available indicators. At this time there is no or only very few indicators for descriptors 1, 4 and 6. Some ongoing work will result in HELCOM CORE set indicators for biodiversity that would be used for D1. However, indicator description is not yet finished. Therefore, it is not possible to assess how well adopted monitoring programme will contribute to assessment needs by use of developed indicators. Consequently, the need to amend monitoring programme is already foreseen. |
There is a linkage between sub-programmes and descriptors provided in monitoring programme. However, the monitoring programme at present stage is incomplete due to lack of knowledge and correspondingly insufficient number of available indicators. At this time there is no or only very few indicators for descriptors 1, 4 and 6. Some ongoing work will result in HELCOM CORE set indicators for biodiversity that would be used for D1. However, indicator description is not yet finished. Therefore, it is not possible to assess how well adopted monitoring programme will contribute to assessment needs by use of developed indicators. Consequently, the need to amend monitoring programme is already foreseen. |
There is a linkage between sub-programmes and descriptors provided in monitoring programme. However, the monitoring programme at present stage is incomplete due to lack of knowledge and correspondingly insufficient number of available indicators. At this time there is no or only very few indicators for descriptors 1, 4 and 6. Some ongoing work will result in HELCOM CORE set indicators for biodiversity that would be used for D1. However, indicator description is not yet finished. Therefore, it is not possible to assess how well adopted monitoring programme will contribute to assessment needs by use of developed indicators. Consequently, the need to amend monitoring programme is already foreseen. |
There is a linkage between sub-programmes and descriptors provided in monitoring programme. However, the monitoring programme at present stage is incomplete due to lack of knowledge and correspondingly insufficient number of available indicators. At this time there is no or only very few indicators for descriptors 1, 4 and 6. Some ongoing work will result in HELCOM CORE set indicators for biodiversity that would be used for D1. However, indicator description is not yet finished. Therefore, it is not possible to assess how well adopted monitoring programme will contribute to assessment needs by use of developed indicators. Consequently, the need to amend monitoring programme is already foreseen. |
||||||||
Q5g - Gap-filling date for GES assessment | After2020 |
After2020 |
After2020 |
After2020 |
After2020 |
After2020 |
After2020 |
By2020 |
By2020 |
By2020 |
By2020 |
By2020 |
By2020 |
By2020 |
By2020 |
|
Q5h - Plans to implement monitoring for GES assessment |
Please see section “Jūras monitoringa programmas nepilnību novēršanas plāns” in monitoring programme.
|
Please see section “Jūras monitoringa programmas nepilnību novēršanas plāns” in monitoring programme.
|
Please see section “Jūras monitoringa programmas nepilnību novēršanas plāns” in monitoring programme.
|
Please see section “Jūras monitoringa programmas nepilnību novēršanas plāns” in monitoring programme.
|
Please see section “Jūras monitoringa programmas nepilnību novēršanas plāns” in monitoring programme. |
Please see section “Jūras monitoringa programmas nepilnību novēršanas plāns” in monitoring programme.
|
Please see section “Jūras monitoringa programmas nepilnību novēršanas plāns” in monitoring programme.
|
Please see section “Jūras monitoringa programmas nepilnību novēršanas plāns” in monitoring programme.
|
||||||||
Q6a -Relevant targets | Q6a - Environmental target | Target 1 Target 6 |
Target 1 Target 6 |
Target 1 Target 6 |
Target 1 Target 6 |
Target 1 Target 6 |
Target 1 Target 6 |
Target 1 Target 6 |
Target 3 |
Target 3 |
Target 3 |
Target 3 |
Target 3 |
Target 3 |
Target 3 |
Target 3 |
Q6a -Relevant targets | Q6a - Associated indicator | |||||||||||||||
Q6b - Adequacy for assessment of targets | Q6b_SuitableData | N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Q6b - Adequacy for assessment of targets | Q6b_EstablishedMethods | N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Q6b - Adequacy for assessment of targets | Q6d_AdequateCapacity | N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Q6c - Target updating | N |
N |
N |
N |
N |
N |
N |
N |
||||||||
Q6d - Description of programme for targets assessment | The monitoring programme is incomplete at the present stage due to lack of knowledge and severe limitation in indicator availability. The indicators are lacking as well as system/tool to aggregate the indicator-based assessments so that the overall progress towards targets could be assessed.
Question 6a:The assessment system that agregates indicators to assess targets is not developped yet. The target values are elaborated for separate indicators. Information on that can be found in document elaborated for Initial assessment (www.lhei.lv/docs/2012/Juras_derektiva_C.pdf) |
The monitoring programme is incomplete at the present stage due to lack of knowledge and severe limitation in indicator availability. The indicators are lacking as well as system/tool to aggregate the indicator-based assessments so that the overall progress towards targets could be assessed.
Question 6a:The assessment system that agregates indicators to assess targets is not developped yet. The target values are elaborated for separate indicators. Information on that can be found in document elaborated for Initial assessment (www.lhei.lv/docs/2012/Juras_derektiva_C.pdf) |
The monitoring programme is incomplete at the present stage due to lack of knowledge and severe limitation in indicator availability. The indicators are lacking as well as system/tool to aggregate the indicator-based assessments so that the overall progress towards targets could be assessed.
Question 6a:The assessment system that agregates indicators to assess targets is not developped yet. The target values are elaborated for separate indicators. Information on that can be found in document elaborated for Initial assessment (www.lhei.lv/docs/2012/Juras_derektiva_C.pdf) |
The monitoring programme is incomplete at the present stage due to lack of knowledge and severe limitation in indicator availability. The indicators are lacking as well as system/tool to aggregate the indicator-based assessments so that the overall progress towards targets could be assessed.
Question 6a:The assessment system that agregates indicators to assess targets is not developped yet. The target values are elaborated for separate indicators. Information on that can be found in document elaborated for Initial assessment (www.lhei.lv/docs/2012/Juras_derektiva_C.pdf) |
The monitoring programme is incomplete at the present stage due to lack of knowledge and severe limitation in indicator availability. The indicators are lacking as well as system/tool to aggregate the indicator-based assessments so that the overall progress towards targets could be assessed.
Question 6a:The assessment system that agregates indicators to assess targets is not developped yet. The target values are elaborated for separate indicators. Information on that can be found in document elaborated for Initial assessment (www.lhei.lv/docs/2012/Juras_derektiva_C.pdf) |
The monitoring programme is incomplete at the present stage due to lack of knowledge and severe limitation in indicator availability. The indicators are lacking as well as system/tool to aggregate the indicator-based assessments so that the overall progress towards targets could be assessed.
Question 6a:The assessment system that agregates indicators to assess targets is not developped yet. The target values are elaborated for separate indicators. Information on that can be found in document elaborated for Initial assessment (www.lhei.lv/docs/2012/Juras_derektiva_C.pdf) |
The monitoring programme is incomplete at the present stage due to lack of knowledge and severe limitation in indicator availability. The indicators are lacking as well as system/tool to aggregate the indicator-based assessments so that the overall progress towards targets could be assessed.
Question 6a:The assessment system that agregates indicators to assess targets is not developped yet. The target values are elaborated for separate indicators. Information on that can be found in document elaborated for Initial assessment (www.lhei.lv/docs/2012/Juras_derektiva_C.pdf) |
The monitoring programme is incomplete at the present stage due to lack of knowledge and severe limitation in indicator availability. The indicators are lacking as well as system/tool to aggregate the indicator-based assessments so that the overall progress towards targets could be assessed.
Question 6a:The assessment system that agregates indicators to assess targets is not developped yet. The target values are elaborated for separate indicators. Information on that can be found in document elaborated for Initial assessment (www.lhei.lv/docs/2012/Juras_derektiva_C.pdf) |
||||||||
Q6e - Gap-filling date for targets assessment | After2020 |
After2020 |
After2020 |
After2020 |
After2020 |
After2020 |
After2020 |
By2020 |
By2020 |
By2020 |
By2020 |
By2020 |
By2020 |
By2020 |
By2020 |
|
Q6f - Plans to implement monitoring for targets assessment |
Please see section “Jūras monitoringa programmas nepilnību novēršanas plāns” in monitoring programme.
|
Please see section “Jūras monitoringa programmas nepilnību novēršanas plāns” in monitoring programme.
|
Please see section “Jūras monitoringa programmas nepilnību novēršanas plāns” in monitoring programme.
|
Please see section “Jūras monitoringa programmas nepilnību novēršanas plāns” in monitoring programme.
|
Please see section “Jūras monitoringa programmas nepilnību novēršanas plāns” in monitoring programme.
|
Please see section “Jūras monitoringa programmas nepilnību novēršanas plāns” in monitoring programme.
|
Please see section “Jūras monitoringa programmas nepilnību novēršanas plāns” in monitoring programme.
|
Please see section “Jūras monitoringa programmas nepilnību novēršanas plāns” in monitoring programme.
|
||||||||
Q7a - Relevant activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Q7b - Description of monitoring of activities | • The land-based pressure monitoring is addressed in the frame of Water framework directive.
• Atmospheric depositions of nutrients and selected contaminants are addressed on regional level through cooperation in HELCOM frame. The actual calculations are performed by EMEP and presented for the whole regional in form of maps.
• The ship traffic intensity as well as oil pollution by ships is addressed in form of regional cooperation in HELCOM. Oil spill maps are regularly updated and published on HELCOM web page covering whole region.
• Fishing pressure is addressed in the frame of CFP.
• The physical impact by port activities (dumping of dredged material, maintenance of port facilities) and potentially impact by construction of other infrastructure is and will be addressed locally in frame of Impact assessment procedure and following operator monitoring.
• The marine litter will be addressed on regional scale. Currently HELCOM Marine litter action plan, that will include also suggestions on monitoring, is in elaboration stage.
• Noise is not addressed at present. |
• The land-based pressure monitoring is addressed in the frame of Water framework directive.
• Atmospheric depositions of nutrients and selected contaminants are addressed on regional level through cooperation in HELCOM frame. The actual calculations are performed by EMEP and presented for the whole regional in form of maps.
• The ship traffic intensity as well as oil pollution by ships is addressed in form of regional cooperation in HELCOM. Oil spill maps are regularly updated and published on HELCOM web page covering whole region.
• Fishing pressure is addressed in the frame of CFP.
• The physical impact by port activities (dumping of dredged material, maintenance of port facilities) and potentially impact by construction of other infrastructure is and will be addressed locally in frame of Impact assessment procedure and following operator monitoring.
• The marine litter will be addressed on regional scale. Currently HELCOM Marine litter action plan, that will include also suggestions on monitoring, is in elaboration stage.
• Noise is not addressed at present. |
• The land-based pressure monitoring is addressed in the frame of Water framework directive.
• Atmospheric depositions of nutrients and selected contaminants are addressed on regional level through cooperation in HELCOM frame. The actual calculations are performed by EMEP and presented for the whole regional in form of maps.
• The ship traffic intensity as well as oil pollution by ships is addressed in form of regional cooperation in HELCOM. Oil spill maps are regularly updated and published on HELCOM web page covering whole region.
• Fishing pressure is addressed in the frame of CFP.
• The physical impact by port activities (dumping of dredged material, maintenance of port facilities) and potentially impact by construction of other infrastructure is and will be addressed locally in frame of Impact assessment procedure and following operator monitoring.
• The marine litter will be addressed on regional scale. Currently HELCOM Marine litter action plan, that will include also suggestions on monitoring, is in elaboration stage.
• Noise is not addressed at present. |
• The land-based pressure monitoring is addressed in the frame of Water framework directive.
• Atmospheric depositions of nutrients and selected contaminants are addressed on regional level through cooperation in HELCOM frame. The actual calculations are performed by EMEP and presented for the whole regional in form of maps.
• The ship traffic intensity as well as oil pollution by ships is addressed in form of regional cooperation in HELCOM. Oil spill maps are regularly updated and published on HELCOM web page covering whole region.
• Fishing pressure is addressed in the frame of CFP.
• The physical impact by port activities (dumping of dredged material, maintenance of port facilities) and potentially impact by construction of other infrastructure is and will be addressed locally in frame of Impact assessment procedure and following operator monitoring.
• The marine litter will be addressed on regional scale. Currently HELCOM Marine litter action plan, that will include also suggestions on monitoring, is in elaboration stage.
• Noise is not addressed at present. |
• The land-based pressure monitoring is addressed in the frame of Water framework directive.
• Atmospheric depositions of nutrients and selected contaminants are addressed on regional level through cooperation in HELCOM frame. The actual calculations are performed by EMEP and presented for the whole regional in form of maps.
• The ship traffic intensity as well as oil pollution by ships is addressed in form of regional cooperation in HELCOM. Oil spill maps are regularly updated and published on HELCOM web page covering whole region.
• Fishing pressure is addressed in the frame of CFP.
• The physical impact by port activities (dumping of dredged material, maintenance of port facilities) and potentially impact by construction of other infrastructure is and will be addressed locally in frame of Impact assessment procedure and following operator monitoring.
• The marine litter will be addressed on regional scale. Currently HELCOM Marine litter action plan, that will include also suggestions on monitoring, is in elaboration stage.
• Noise is not addressed at present. |
• The land-based pressure monitoring is addressed in the frame of Water framework directive.
• Atmospheric depositions of nutrients and selected contaminants are addressed on regional level through cooperation in HELCOM frame. The actual calculations are performed by EMEP and presented for the whole regional in form of maps.
• The ship traffic intensity as well as oil pollution by ships is addressed in form of regional cooperation in HELCOM. Oil spill maps are regularly updated and published on HELCOM web page covering whole region.
• Fishing pressure is addressed in the frame of CFP.
• The physical impact by port activities (dumping of dredged material, maintenance of port facilities) and potentially impact by construction of other infrastructure is and will be addressed locally in frame of Impact assessment procedure and following operator monitoring.
• The marine litter will be addressed on regional scale. Currently HELCOM Marine litter action plan, that will include also suggestions on monitoring, is in elaboration stage.
• Noise is not addressed at present. |
• The land-based pressure monitoring is addressed in the frame of Water framework directive.
• Atmospheric depositions of nutrients and selected contaminants are addressed on regional level through cooperation in HELCOM frame. The actual calculations are performed by EMEP and presented for the whole regional in form of maps.
• The ship traffic intensity as well as oil pollution by ships is addressed in form of regional cooperation in HELCOM. Oil spill maps are regularly updated and published on HELCOM web page covering whole region.
• Fishing pressure is addressed in the frame of CFP.
• The physical impact by port activities (dumping of dredged material, maintenance of port facilities) and potentially impact by construction of other infrastructure is and will be addressed locally in frame of Impact assessment procedure and following operator monitoring.
• The marine litter will be addressed on regional scale. Currently HELCOM Marine litter action plan, that will include also suggestions on monitoring, is in elaboration stage.
• Noise is not addressed at present. |
• The land-based pressure monitoring is addressed in the frame of Water framework directive.
• Atmospheric depositions of nutrients and selected contaminants are addressed on regional level through cooperation in HELCOM frame. The actual calculations are performed by EMEP and presented for the whole regional in form of maps.
• The ship traffic intensity as well as oil pollution by ships is addressed in form of regional cooperation in HELCOM. Oil spill maps are regularly updated and published on HELCOM web page covering whole region.
• Fishing pressure is addressed in the frame of CFP.
• The physical impact by port activities (dumping of dredged material, maintenance of port facilities) and potentially impact by construction of other infrastructure is and will be addressed locally in frame of Impact assessment procedure and following operator monitoring.
• The marine litter will be addressed on regional scale. Currently HELCOM Marine litter action plan, that will include also suggestions on monitoring, is in elaboration stage.
• Noise is not addressed at present. |
||||||||
Q7c - Relevant measures | ||||||||||||||||
Q7e - Adequacy for assessment of measures | Q7d - Adequate data | N |
N |
N |
N |
N |
N |
N |
N |
|||||||
Q7e - Adequacy for assessment of measures | Q7d - Established methods | N |
N |
N |
N |
N |
N |
N |
N |
|||||||
Q7e - Adequacy for assessment of measures | Q7d - Adequate understanding of GES | N |
N |
N |
N |
N |
N |
N |
N |
|||||||
Q7e - Adequacy for assessment of measures | Q7d - Adequate capacity | N |
N |
N |
N |
N |
N |
N |
N |
|||||||
Q7e - Adequacy for assessment of measures | Q7d - Addresses activities and pressures | N |
N |
N |
N |
N |
N |
N |
N |
|||||||
Q7e - Adequacy for assessment of measures | Q7d - Addresses effectiveness of measures | N |
N |
N |
N |
N |
N |
N |
N |
|||||||
Q7d - Description of monitoring for measures | Monitoring of measures is not part of National environmental monitoring programme. Measures and their monitoring will be addressed in coming Programme of measures. |
Monitoring of measures is not part of National environmental monitoring programme. Measures and their monitoring will be addressed in coming Programme of measures. |
Monitoring of measures is not part of National environmental monitoring programme. Measures and their monitoring will be addressed in coming Programme of measures. |
Monitoring of measures is not part of National environmental monitoring programme. Measures and their monitoring will be addressed in coming Programme of measures. |
Monitoring of measures is not part of National environmental monitoring programme. Measures and their monitoring will be addressed in coming Programme of measures. |
Monitoring of measures is not part of National environmental monitoring programme. Measures and their monitoring will be addressed in coming Programme of measures. |
Monitoring of measures is not part of National environmental monitoring programme. Measures and their monitoring will be addressed in coming Programme of measures. |
Monitoring of measures is not part of National environmental monitoring programme. Measures and their monitoring will be addressed in coming Programme of measures. |
||||||||
Q7f - Gap-filling date for activities and measures | After2020 |
After2020 |
After2020 |
After2020 |
After2020 |
After2020 |
After2020 |
By2020 |
By2020 |
By2020 |
By2020 |
By2020 |
By2020 |
By2020 |
By2020 |
|
Q8a - Links to existing Monitoring Programmes |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Reference sub-programme | Sub-programme ID | |||||||||||||||
Reference sub-programme | Sub-programme name | Pelagic habitats - community characteristics |
Plankton blooms (biomass, frequency) |
Seabed habitats - community characteristics |
Benthic species - abundance and/or biomass |
Seabed habitats - distribution and extent |
Non-indigenous species - abundance and/or biomass |
Non-indigenous species inputs - from specific sources |
Water column - physical characteristics |
Water column - chemical characteristics |
Nutrient levels - in water column |
Pelagic habitats - community characteristics |
Seabed habitats - physical/chemical characteristics |
Nutrient inputs - land-based sources |
Nutrient inputs - from atmosphere |
Plankton blooms (biomass, frequency) |
Q4g - Sub-programmes | Sub-programme ID | |||||||||||||||
Q4g - Sub-programmes | Sub-programme name | Pelagic habitats - community characteristics |
Plankton blooms (biomass, frequency) |
Seabed habitats - community characteristics |
Benthic species - abundance and/or biomass |
Seabed habitats - distribution and extent |
Non-indigenous species - abundance and/or biomass |
Non-indigenous species inputs - from specific sources |
Water column - physical characteristics |
Water column - chemical characteristics |
Nutrient levels - in water column |
Pelagic habitats - community characteristics |
Seabed habitats - physical/chemical characteristics |
Nutrient inputs - land-based sources |
Nutrient inputs - from atmosphere |
Plankton blooms (biomass, frequency) |
Q4k - Monitoring purpose | ||||||||||||||||
Q4l - Links of monitoring programmes of other Directives and Conventions | ||||||||||||||||
Q5c - Features | Q5c - Habitats |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Q5c - Features | Q5c - Species list |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Q5c - Features | Q5c - Physical/Chemical features |
|
|
|
|
|
|
|
|
|||||||
Q5c - Features | Q5c - Pressures |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Q9a - Elements | ||||||||||||||||
Q5a - GES criteria | Relevant GES criteria |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Q5b - GES indicators | Relevant GES indicators |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Q9b - Parameters monitored (state/impact) | Species distribution | |||||||||||||||
Q9b - Parameters monitored (state/impact) | Species population size | |||||||||||||||
Q9b - Parameters monitored (state/impact) | Species population characteristics | |||||||||||||||
Q9b - Parameters monitored (state/impact) | Species impacts | |||||||||||||||
Q9b - Parameters monitored (state/impact) | Habitat distribution | |||||||||||||||
Q9b - Parameters monitored (state/impact) | Habitat extent | |||||||||||||||
Q9b - Parameters monitored (state/impact) | Habitat condition (physical-chemical) | |||||||||||||||
Q9b - Parameters monitored (state/impact) | Habitat condition (biological) | |||||||||||||||
Q9b - Parameters monitored (state/impact) | Habitat impacts | |||||||||||||||
Q9b - Parameters monitored (pressures) | Pressure input | |||||||||||||||
Q9b - Parameters monitored (pressures) | Pressure output | |||||||||||||||
Q9b - Parameters monitored (activity) | Activity | |||||||||||||||
Q9b Parameters monitored (other) | Other | |||||||||||||||
Q41 Spatial scope | ||||||||||||||||
Q4j - Description of spatial scope | ||||||||||||||||
Marine Unit IDs |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Q4h - Temporal scope | Start date- End date | - |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
Q9h - Temporal resolution of sampling | ||||||||||||||||
Q9c - Monitoring method | ||||||||||||||||
Q9d - Description of alteration to method | ||||||||||||||||
Q9e - Quality assurance | ||||||||||||||||
Q9f - Quality control | ||||||||||||||||
Q9g - Spatial resolution of sampling | Q9g - Proportion of area covered % | |||||||||||||||
Q9g - Spatial resolution of sampling | Q9g - No. of samples | |||||||||||||||
Q9i - Description of sample representivity | ||||||||||||||||
Q10a - Scale for aggregation of data | ||||||||||||||||
Q10b - Other scale for aggregation of data | ||||||||||||||||
Q10c - Access to monitoring data | Q10c - Data type | |||||||||||||||
Q10c - Access to monitoring data | Q10c - Data access mechanism | |||||||||||||||
Q10c - Access to monitoring data | Q10c - Data access rights | |||||||||||||||
Q10c - Access to monitoring data | Q10c - INSPIRE standard | |||||||||||||||
Q10c - Access to monitoring data | Q10c Date data are available | |||||||||||||||
Q10c - Access to monitoring data | Q10c - Data update frequency | |||||||||||||||
Q10d - Description of data access | ||||||||||||||||
Descriptor |
D1.1 |
D1.1 |
D1.1 |
D1.1 |
---|---|---|---|---|
Monitoring strategy description |
The section addresses state (number and distribution of wintering birds). The full survey is planned once every 6 years in coordination with other Baltic Sea states. In addition, annually "index" surveys are planned to obtain an estimate of long term inter-annual variation of wintering bird populations. Pressure and impact are monitored under other sub-programs. |
The section addresses state (number and distribution of wintering birds). The full survey is planned once every 6 years in coordination with other Baltic Sea states. In addition, annually "index" surveys are planned to obtain an estimate of long term inter-annual variation of wintering bird populations. Pressure and impact are monitored under other sub-programs. |
The section addresses state (number and distribution of wintering birds). The full survey is planned once every 6 years in coordination with other Baltic Sea states. In addition, annually "index" surveys are planned to obtain an estimate of long term inter-annual variation of wintering bird populations. Pressure and impact are monitored under other sub-programs. |
The section addresses state (number and distribution of wintering birds). The full survey is planned once every 6 years in coordination with other Baltic Sea states. In addition, annually "index" surveys are planned to obtain an estimate of long term inter-annual variation of wintering bird populations. Pressure and impact are monitored under other sub-programs. |
Coverage of GES criteria |
Adequate monitoring was in place by 2018 |
Adequate monitoring was in place by 2018 |
Adequate monitoring was in place by 2018 |
Adequate monitoring was in place by 2018 |
Gaps and plans |
none
|
none
|
none
|
none
|
Related targets |
|
|
|
|
Coverage of targets |
Adequate monitoring was in place by 2018 |
Adequate monitoring was in place by 2018 |
Adequate monitoring was in place by 2018 |
Adequate monitoring was in place by 2018 |
Related measures |
||||
Coverage of measures |
||||
Related monitoring programmes |
|
|
|
|
Programme code |
LV-4.1.1.2.1. (D1C2) |
LV-4.1.1.2.1. (D1C2) |
LV-4.1.1.2.1. (D1C2) |
LV-4.1.1.2.1. (D1C2) |
Programme name |
Mobile species distribution, abundance and/or biomass (wintering seabirds) |
Mobile species distribution, abundance and/or biomass (wintering seabirds) |
Mobile species distribution, abundance and/or biomass (wintering seabirds) |
Mobile species distribution, abundance and/or biomass (wintering seabirds) |
Update type |
New programme |
New programme |
New programme |
New programme |
Old programme codes |
||||
Programme description |
The purpose of the monitoring is to assess the ecological status of the Baltic Sea, including one of the environmental status components biodiversity by observing abundance and distribution of wintering seabirds as well as changes in the composition, number and distribution of bird species occurring in the marine territories of Latvia, as well as to identify and predict the trends of these changes. The programme supports the assessment of temporal trends and spatial distribution.
Corresponding HELCOM monitoring programme Birds and
sub-programme "Marine wintering birds abundance and distribution".
At present monitoring of birds is partly coordinated in HELCOM and the information presented in the Monitoring Manual is based on national monitoring programmes.
The requirements for the marine waters of Latvia and the relationship of the specified environmental objectives with the qualitative characteristics characterizing the state of the marine environment are included in Regulation of the Cabinet of Ministers of Republic of Latvia No. 1071 of 23 November 2010, Requirements for the Assessment of the State of the Marine Environment, the Determination of Good Environmental State of the Sea and Development of Marine Environmental Goals.
Corresponding legislative act of the Republic of Latvia:
Law On the Conservation of Species and Biotopes (adopted 16.03.2000);
Republic of Latvia Cabinet Regulation No. 17 (adopted 5 January 2010) Regulations Regarding Protected Marine Territories. |
The purpose of the monitoring is to assess the ecological status of the Baltic Sea, including one of the environmental status components biodiversity by observing abundance and distribution of wintering seabirds as well as changes in the composition, number and distribution of bird species occurring in the marine territories of Latvia, as well as to identify and predict the trends of these changes. The programme supports the assessment of temporal trends and spatial distribution.
Corresponding HELCOM monitoring programme Birds and
sub-programme "Marine wintering birds abundance and distribution".
At present monitoring of birds is partly coordinated in HELCOM and the information presented in the Monitoring Manual is based on national monitoring programmes.
The requirements for the marine waters of Latvia and the relationship of the specified environmental objectives with the qualitative characteristics characterizing the state of the marine environment are included in Regulation of the Cabinet of Ministers of Republic of Latvia No. 1071 of 23 November 2010, Requirements for the Assessment of the State of the Marine Environment, the Determination of Good Environmental State of the Sea and Development of Marine Environmental Goals.
Corresponding legislative act of the Republic of Latvia:
Law On the Conservation of Species and Biotopes (adopted 16.03.2000);
Republic of Latvia Cabinet Regulation No. 17 (adopted 5 January 2010) Regulations Regarding Protected Marine Territories. |
The purpose of the monitoring is to assess the ecological status of the Baltic Sea, including one of the environmental status components biodiversity by observing abundance and distribution of wintering seabirds as well as changes in the composition, number and distribution of bird species occurring in the marine territories of Latvia, as well as to identify and predict the trends of these changes. The programme supports the assessment of temporal trends and spatial distribution.
Corresponding HELCOM monitoring programme Birds and
sub-programme "Marine wintering birds abundance and distribution".
At present monitoring of birds is partly coordinated in HELCOM and the information presented in the Monitoring Manual is based on national monitoring programmes.
The requirements for the marine waters of Latvia and the relationship of the specified environmental objectives with the qualitative characteristics characterizing the state of the marine environment are included in Regulation of the Cabinet of Ministers of Republic of Latvia No. 1071 of 23 November 2010, Requirements for the Assessment of the State of the Marine Environment, the Determination of Good Environmental State of the Sea and Development of Marine Environmental Goals.
Corresponding legislative act of the Republic of Latvia:
Law On the Conservation of Species and Biotopes (adopted 16.03.2000);
Republic of Latvia Cabinet Regulation No. 17 (adopted 5 January 2010) Regulations Regarding Protected Marine Territories. |
The purpose of the monitoring is to assess the ecological status of the Baltic Sea, including one of the environmental status components biodiversity by observing abundance and distribution of wintering seabirds as well as changes in the composition, number and distribution of bird species occurring in the marine territories of Latvia, as well as to identify and predict the trends of these changes. The programme supports the assessment of temporal trends and spatial distribution.
Corresponding HELCOM monitoring programme Birds and
sub-programme "Marine wintering birds abundance and distribution".
At present monitoring of birds is partly coordinated in HELCOM and the information presented in the Monitoring Manual is based on national monitoring programmes.
The requirements for the marine waters of Latvia and the relationship of the specified environmental objectives with the qualitative characteristics characterizing the state of the marine environment are included in Regulation of the Cabinet of Ministers of Republic of Latvia No. 1071 of 23 November 2010, Requirements for the Assessment of the State of the Marine Environment, the Determination of Good Environmental State of the Sea and Development of Marine Environmental Goals.
Corresponding legislative act of the Republic of Latvia:
Law On the Conservation of Species and Biotopes (adopted 16.03.2000);
Republic of Latvia Cabinet Regulation No. 17 (adopted 5 January 2010) Regulations Regarding Protected Marine Territories. |
Monitoring purpose |
|
|
|
|
Other policies and conventions |
|
|
|
|
Regional cooperation - coordinating body |
|
|
|
|
Regional cooperation - countries involved |
||||
Regional cooperation - implementation level |
Coordinated data collection |
Coordinated data collection |
Coordinated data collection |
Coordinated data collection |
Monitoring details |
Monitoring of wintering marine birds is performed by aerial surveillance in transects in the whole marine aquatory in the territorial waters of Latvia. Used transects 3 km in shallow zones or every 6 km in deep zones. Monitored parameters - the abundance of species as well as the number and density of individuals identified for each species.
Two types of surveys are used for the population size and annual population variability data.
First full account is intended to assess the size of wintering marine bird populations and primarily are performed together with other HELCOM region states in the years when coordinated inventory takes place in the Baltic sea, but not less than once in a six years.
Second in all other years, so-called index assessment is carried out in order to obtain data on annual variations in populations of wintering water birds. |
Monitoring of wintering marine birds is performed by aerial surveillance in transects in the whole marine aquatory in the territorial waters of Latvia. Used transects 3 km in shallow zones or every 6 km in deep zones. Monitored parameters - the abundance of species as well as the number and density of individuals identified for each species.
Two types of surveys are used for the population size and annual population variability data.
First full account is intended to assess the size of wintering marine bird populations and primarily are performed together with other HELCOM region states in the years when coordinated inventory takes place in the Baltic sea, but not less than once in a six years.
Second in all other years, so-called index assessment is carried out in order to obtain data on annual variations in populations of wintering water birds. |
Monitoring of wintering marine birds is performed by aerial surveillance in transects in the whole marine aquatory in the territorial waters of Latvia. Used transects 3 km in shallow zones or every 6 km in deep zones. Monitored parameters - the abundance of species as well as the number and density of individuals identified for each species.
Two types of surveys are used for the population size and annual population variability data.
First full account is intended to assess the size of wintering marine bird populations and primarily are performed together with other HELCOM region states in the years when coordinated inventory takes place in the Baltic sea, but not less than once in a six years.
Second in all other years, so-called index assessment is carried out in order to obtain data on annual variations in populations of wintering water birds. |
Monitoring of wintering marine birds is performed by aerial surveillance in transects in the whole marine aquatory in the territorial waters of Latvia. Used transects 3 km in shallow zones or every 6 km in deep zones. Monitored parameters - the abundance of species as well as the number and density of individuals identified for each species.
Two types of surveys are used for the population size and annual population variability data.
First full account is intended to assess the size of wintering marine bird populations and primarily are performed together with other HELCOM region states in the years when coordinated inventory takes place in the Baltic sea, but not less than once in a six years.
Second in all other years, so-called index assessment is carried out in order to obtain data on annual variations in populations of wintering water birds. |
Features |
Benthic-feeding birds
|
Grazing birds
|
Pelagic-feeding birds
|
Surface-feeding birds
|
Benthic-feeding birds
|
Grazing birds
|
Pelagic-feeding birds
|
Surface-feeding birds
|
|
Benthic-feeding birds
|
Grazing birds
|
Pelagic-feeding birds
|
Surface-feeding birds
|
|
Benthic-feeding birds
|
Grazing birds
|
Pelagic-feeding birds
|
Surface-feeding birds
|
|
Elements |
|
|
|
|
GES criteria |
D1C2 |
D1C2 |
D1C2 |
D1C2 |
Parameters |
|
|
|
|
Parameter Other |
||||
Spatial scope |
|
|
|
|
Marine reporting units |
|
|
|
|
Temporal scope (start date - end date) |
2021-2026 |
2021-2026 |
2021-2026 |
2021-2026 |
Monitoring frequency |
Yearly |
Yearly |
Yearly |
Yearly |
Monitoring type |
|
|
|
|
Monitoring method |
|
|
|
|
Monitoring method other |
||||
Quality control |
QA/QC procedures no
|
QA/QC procedures no
|
QA/QC procedures no
|
QA/QC procedures no
|
Data management |
Data holder is Nature Conservation Agency of Latvia (NCA)
QA/QC on data no.
Data are available in NCA. |
Data holder is Nature Conservation Agency of Latvia (NCA)
QA/QC on data no.
Data are available in NCA. |
Data holder is Nature Conservation Agency of Latvia (NCA)
QA/QC on data no.
Data are available in NCA. |
Data holder is Nature Conservation Agency of Latvia (NCA)
QA/QC on data no.
Data are available in NCA. |
Data access |
||||
Related indicator/name |
|
|
|
|
Contact |
Nature Conservation Agency of Latvia (NCA) |
Nature Conservation Agency of Latvia (NCA) |
Nature Conservation Agency of Latvia (NCA) |
Nature Conservation Agency of Latvia (NCA) |
References |