Member State report / Art10 / 2018 / D2 / Germany / NE Atlantic: Greater North Sea

Report type Member State report to Commission
MSFD Article Art. 10 Environmental targets (and Art. 17 updates)
Report due 2018-10-15
GES Descriptor D2 Non-indigenous species
Member State Germany
Region/subregion NE Atlantic: Greater North Sea
Reported by Bundesministerium für Umwelt, Naturschutz und Reaktorsicherheit
Report date 2020-02-17
Report access DE_ART10_Targets.xml

Target code
UZN3
UZN3.5
UZN5
UZN5.1
UZN5.2
UZN5.3
Target description
The global objective is: "Seas without harming marine species and habitats through the impact of human activities". The objective is implemented by means of the operational objectives UZ3.1, UZN3.2, UZN3.3, UZN3.4 and UZN3.5. The environmental objectives established in 2012 and their description under the 2012 MSFD report continue to apply. They are the basis for the 2016-2021 programme of measures notified to the European Commission in 2016. Since the implementation of the measures was only started in 2016, an assessment of the progress and effectiveness of the measures as a basis for updating the environmental objectives is often not yet possible. Where possible, the text report shows the achievement of objectives and/or the state of implementation of the measures. Only in individual cases where an indicator assessment is available on progress towards achieving the target will this be reported in the Progress Assessment.
The total number of introductions and movements of new species is close to zero. Prevention measures are implemented to minimise (unintentional) introduction. Emerging species will be identified in time to ensure that promising emergency measures can be implemented, if necessary. The signing and implementation of existing regulations and conventions are an important prerequisite for this. The environmental objectives established by Germany in 2012 are the basis for the 2016-2021 programme of measures notified to the European Commission in 2016. Since the implementation of the measures was only started in 2016, an assessment of the progress and effectiveness of the measures as a basis for updating the environmental objectives is often not yet possible. Where possible, the text report shows the achievement of objectives and/or the state of implementation of the measures. Only in individual cases where an indicator assessment is available on progress towards achieving the target will this be reported in the Progress Assessment. The indicator "Trend and number of newly introduced non-native species", which is relevant to Article 10, is not included here, as it is already reported in detail under Article 8_GES (D2C1). Reference is made to Article 8_GES (D2C1).
The objective is "Seas without pressures from waste". The objective is implemented by means of the operational objectives UZN5.1, UZN5.2 and UZN5.3. The environmental objectives established in 2012 and their description under the 2012 MSFD report continue to apply. They are the basis for the 2016-2021 programme of measures notified to the European Commission in 2016. Since the implementation of the measures was only started in 2016, an assessment of the progress and effectiveness of the measures as a basis for updating the environmental objectives is often not yet possible. Where possible, the text report shows the achievement of objectives and/or the state of implementation of the measures. Only in individual cases where an indicator assessment is available on the state of achievement of the target, this will be reported in the Progress Assessment.
A continuous reduction of input of and already present waste results in a significant reduction of harmful effects on the marine environment on beaches, the sea surface, the water column and the seabed. The environmental objectives established by Germany in 2012 are the basis for the 2016-2021 programme of measures notified to the European Commission in 2016. Since the implementation of the measures was only started in 2016, an assessment of the progress and effectiveness of the measures as a basis for updating the environmental objectives is often not yet possible. Where possible, the text report shows the achievement of objectives and/or the state of implementation of the measures. Only in individual cases where an indicator assessment is available on the state of achievement of the target, this will be reported in the Progress Assessment. The indicator "number of waste parts" relevant for Article 10 is not included here, as it is already reported in detail under Article 8_GES (D10C1). Reference is made to Article 8_ESG reporting.
Hazardous waste proven to be present in marine organisms (in particular, microplastics) are approaching zero in the long term. The environmental objectives established by Germany in 2012 are the basis for the 2016-2021 programme of measures notified to the European Commission in 2016. Since the implementation of the measures was only started in 2016, an assessment of the progress and effectiveness of the measures as a basis for updating the environmental objectives is often not yet possible. Where possible, the text report shows the achievement of objectives and/or the state of implementation of the measures. The level of achievement of objectives will be assessed through OSPAR indicator OSPAR PLASTIC_FUL_STMCHS: Waste quantities in stomachs of fulmars reported in the North Sea for D10C1 and D10C3 in Article 8 Report Sheet. Reporting will not be repeated under ProgressAssessment.
Other adverse environmental effects (such as entanglement and strangulation by waste parts) are reduced to a minimum. The environmental objectives established by Germany in 2012 are the basis for the 2016-2021 programme of measures notified to the European Commission in 2016. Since the implementation of the measures was only started in 2016, an assessment of the progress and effectiveness of the measures as a basis for updating the environmental objectives is often not yet possible. Where possible, the text report shows the achievement of objectives and/or the state of implementation of the measures. Only in individual cases where an indicator assessment on the state of achievement of the target is available, this will be reported in the Progress Assessment. The indicator "number of live birds in breeding colonies", which is considered under Article 10, is not included here, as the detailed report under Article 8_GES (D10C4) is already reported. Reference is made to Article 8_ESG reporting.
Feature(s)
  • Changes to hydrological conditions
  • Eutrophication
  • Extraction of, or mortality/injury to, wild species (by commercial and recreational fishing and other activities)
  • Input of anthropogenic sound (impulsive, continuous)
  • Input of litter (solid waste matter, including micro-sized litter)
  • Input of microbial pathogens
  • Input of nutrients - diffuse sources, point sources, atmospheric deposition
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input or spread of non-indigenous species
  • Newly-introduced non-indigenous species
  • Physical disturbance to seabed
  • Physical loss of the seabed
  • Input of microbial pathogens
  • Input or spread of non-indigenous species
  • Newly-introduced non-indigenous species
  • Input of litter (solid waste matter, including micro-sized litter)
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input or spread of non-indigenous species
  • Input of litter (solid waste matter, including micro-sized litter)
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input or spread of non-indigenous species
  • Input of litter (solid waste matter, including micro-sized litter)
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input or spread of non-indigenous species
  • Input of litter (solid waste matter, including micro-sized litter)
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events
  • Input or spread of non-indigenous species
GES components
  • D1-B
  • D1-C
  • D1-F
  • D1-M
  • D1-P
  • D11
  • D2
  • D4
  • D6
  • D1-P
  • D2
  • D4
  • D6
  • D1-B
  • D1-C
  • D1-F
  • D1-M
  • D1-P
  • D10
  • D2
  • D4
  • D6
  • D8
  • D9
  • D1-B
  • D1-C
  • D1-F
  • D1-M
  • D1-P
  • D10
  • D2
  • D4
  • D6
  • D8
  • D9
  • D1-B
  • D1-C
  • D1-F
  • D1-M
  • D1-P
  • D10
  • D2
  • D4
  • D6
  • D8
  • D9
  • D1-B
  • D1-C
  • D1-F
  • D1-M
  • D1-P
  • D10
  • D2
  • D4
  • D6
  • D8
  • D9
Timescale
202012
202012
202012
202012
202012
202012
Update date
201810
201810
201810
201810
201810
201810
Update type
Same as 2012 definition
Same as 2012 definition
Same as 2012 definition
Same as 2012 definition
Same as 2012 definition
Same as 2012 definition
Marine reporting unit
  • ANSDE_MS
  • ANSDE_MS
  • ANSDE_MS
  • ANSDE_MS
  • ANSDE_MS
  • ANSDE_MS
Element
Not specified
Not specified
Not specified
Not specified
Not specified
Not specified
Element 2
Not specified
Not specified
Not specified
Not specified
Parameter
Other
Other
Other
Other
Other
Other
Parameter - other
Not specified
Not specified
Not specified
Not specified
Not specified
Not specified
Target value
Value achieved - upper
Value achieved - lower
Value unit
Value unit - other
Target status
Target not yet achieved
Target not yet achieved
Assessment period
2011-2016
2011-2016
2011-2016
2011-2016
2011-2016
2011-2016
Target assessment description
There are no specific indicators for assessing progress. However, for birds, fish, mammals and benthic habitats, the overall environmental target UZ3 has not been reached.
There are no specific indicators for assessing progress.
The assessment of progress takes place at the level of operational environmental objectives.
The indicators reported in 2012 for the assessment of the environmental objective are: " Number of waste fractions of different materials and categories per area": Not assessed "Volumes of the waste fractions of different materials and categories per area": Not assessed For information on data collection, see art. 8_GES to D10C1.
The indicator reported in 2012 for the assessment of progress is "garbage in birds (e.g. fulmar) and other indicator species". See evaluation under Article 8_D10C3.
The indicators reported in 2012 for the assessment of progress are: "Number of live birds in breeding colonies": Not assessed "Birds and other indicator species found dead due to entanglement": Not assessed For data collection see art. 8_GES D10C4.
Related indicator
Related measures
  • ANSDE-M409-UZ3-01
  • ANSDE-M412-UZ4-02
  • ANSDE-M430-UZ6-06
  • ANSDE-M914-other
  • ANSDE-M915-other
  • ANSDE-M916-other
  • ANSDE-M923-other
  • ANSDE-M924-other
  • ANSDE-M925-other
  • ANSDE-M405-UZ2-01
  • ANSDE-M911-other
  • ANSDE-M912-other
  • ANSDE-M913-other
  • ANSDE-M923-other
  • ANSDE-M004-WFD
  • ANSDE-M405-UZ2-01
  • ANSDE-M416-UZ5-01
  • ANSDE-M417-UZ5-02
  • ANSDE-M418-UZ5-03
  • ANSDE-M419-UZ5-04
  • ANSDE-M420-UZ5-05
  • ANSDE-M421-UZ5-06
  • ANSDE-M422-UZ5-07
  • ANSDE-M423-UZ5-08
  • ANSDE-M424-UZ5-09
  • ANSDE-M930-other
  • ANSDE-M931-other
  • ANSDE-M932-other
  • ANSDE-M933-other
  • ANSDE-M004-WFD
  • ANSDE-M405-UZ2-01
  • ANSDE-M416-UZ5-01
  • ANSDE-M417-UZ5-02
  • ANSDE-M418-UZ5-03
  • ANSDE-M419-UZ5-04
  • ANSDE-M420-UZ5-05
  • ANSDE-M421-UZ5-06
  • ANSDE-M422-UZ5-07
  • ANSDE-M423-UZ5-08
  • ANSDE-M424-UZ5-09
  • ANSDE-M930-other
  • ANSDE-M931-other
  • ANSDE-M932-other
  • ANSDE-M933-other
  • ANSDE-M405-UZ2-01
  • ANSDE-M417-UZ5-02
  • ANSDE-M418-UZ5-03
  • ANSDE-M419-UZ5-04
  • ANSDE-M420-UZ5-05
  • ANSDE-M421-UZ5-06
  • ANSDE-M422-UZ5-07
  • ANSDE-M424-UZ5-09
  • ANSDE-M405-UZ2-01
  • ANSDE-M418-UZ5-03
  • ANSDE-M419-UZ5-04
  • ANSDE-M420-UZ5-05
  • ANSDE-M421-UZ5-06
  • ANSDE-M422-UZ5-07