Member State report / Art10 / 2018 / D1-P / Mediterranean

Report type Member State report to Commission
MSFD Article Art. 10 Environmental targets (and Art. 17 updates)
Report due 2018-10-15
GES Descriptor D1 Pelagic habitats
Region/subregion Mediterranean
Reported by Member state
Member state
United Kingdom
Spain
France
Italy
Malta
Slovenia
Croatia
Greece
Cyprus
Member state report
Reporting area(s) MRUs used
  • MWE-ES-SD-ESAL
  • MWE-ES-SD-LEV
  • MWE-FR-MS-MO
  • MIC-MT-MS-01
  • MAD-SI-MRU-1
  • MAD-HR-MRU_1
  • MAL-CY-MS
Features Structure, functions and processes of marine ecosystems: Species
  • Marine species (8)
  • All birds (1)
  • All mammals (1)
  • Coastal fish (2)
  • Demersal shelf fish (2)
  • Turtles (1)
  • All birds (4)
  • All cephalopods (4)
  • All fish (4)
  • All mammals (4)
  • Deep-sea fish (4)
  • Demersal shelf fish (4)
  • Pelagic shelf fish (4)
  • Seals (4)
  • Small toothed cetaceans (4)
  • Turtles (4)
Features Structure, functions and processes of marine ecosystems: Habitats
  • All habitats (2)
  • Benthic habitats (4)
  • Benthic habitats (3)
  • Circalittoral coarse sediment (1)
  • Circalittoral mixed sediment (1)
  • Circalittoral mud (1)
  • Circalittoral rock and biogenic reef (1)
  • Circalittoral sand (1)
  • Infralittoral coarse sediment (1)
  • Infralittoral mixed sediment (1)
  • Infralittoral mud (1)
  • Infralittoral rock and biogenic reef (1)
  • Infralittoral sand (1)
  • Littoral rock and biogenic reef (1)
  • Littoral sediment (1)
  • Offshore circalittoral coarse sediment (1)
  • Offshore circalittoral mixed sediment (1)
  • Offshore circalittoral mud (1)
  • Offshore circalittoral rock and biogenic reef (1)
  • Offshore circalittoral sand (1)
  • Other benthic habitats (2)
  • Pelagic habitats (4)
  • Pelagic broad habitats (1)
  • Pelagic broad habitats (1)
  • Littoral sediment (1)
  • Pelagic habitats (2)
  • Coastal (4)
Features Structure, functions and processes of marine ecosystems: Ecosystems, including food webs
  • All physical and hydrological characteristics (2)
Features Structure, functions and processes of marine ecosystems: No theme
  • All marine ecosystem elements (45)
Features Anthropogenic pressures on the marine environment: Biological
  • Extraction of, or mortality/injury to, wild species (by commercial and recreational fishing and other activities) (2)
  • Input or spread of non-indigenous species (8)
  • All biological pressures (1)
  • Extraction of, or mortality/injury to, wild species (by commercial and recreational fishing and other activities) (1)
  • Input of microbial pathogens (1)
  • Input or spread of non-indigenous species (1)
Features Anthropogenic pressures on the marine environment: Physical
  • Changes to hydrological conditions (6)
  • Physical disturbance to seabed (4)
  • Physical loss of the seabed (2)
  • Physical disturbance to seabed (2)
  • Physical loss of the seabed (2)
Features Anthropogenic pressures on the marine environment: Substances, litter and energy
  • All pressures related to inputs of substances, litter and energy (2)
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events (2)
  • Input of litter (solid waste matter, including micro-sized litter) (1)
  • Input of nutrients - diffuse sources, point sources, atmospheric deposition (1)
  • Input of other substances (e.g. synthetic substances, non-synthetic substances, radionuclides) - diffuse sources, point sources, atmospheric deposition, acute events (1)
Features Anthropogenic pressures on the marine environment: No theme
  • All pressures (2)
Features Pressure levels and impacts in marine environment: Biological
  • Established non-indigenous species (2)
  • Newly-introduced non-indigenous species (2)
Features Pressure levels and impacts in marine environment: Physical and hydrological
  • Hydrographical changes (2)
Features Pressure levels and impacts in marine environment: Chemical
  • Eutrophication (1)
Features Uses and human activities in or affecting the marine environment: Physical restructuring of rivers, coastline or seabed (water management)
  • All activities related to physical restructuring of rivers, coastline or seabed (2)
Features Uses and human activities in or affecting the marine environment: Cultivation of living resources
  • Aquaculture - marine, including infrastructure (2)
Features Uses and human activities in or affecting the marine environment: No theme
  • All activities (2)
GES components
  • D1 Biodiversity (81)
  • D10 Litter (29)
  • D11 Energy, incl. underwater noise (27)
  • D2 Non-indigenous species (41)
  • D3 Commercial fish and shellfish (39)
  • D4 Food webs/D1 Ecosystems (63)
  • D5 Eutrophication (29)
  • D6 Sea-floor integrity/D1 Benthic habitats (54)
  • D7 Hydrographical changes (39)
  • D8 Contaminants (31)
  • D9 Contaminants in seafood (27)
  • D1 Biodiversity (4)
  • D10 Litter (1)
  • D2 Non-indigenous species (1)
  • D3 Commercial fish and shellfish (2)
  • D4 Food webs/D1 Ecosystems (4)
  • D6 Sea-floor integrity/D1 Benthic habitats (4)
  • D7 Hydrographical changes (1)
  • D8 Contaminants (1)
  • D9 Contaminants in seafood (1)
  • D1C6 Pelagic habitat condition (1.5.2, 1.6, 1.6.1, 1.6.2, 1.6.3) (1)
  • D5C1 Nutrient concentrations (5.1, 5.1.1) (1)
  • D1 Pelagic habitats (1)
  • D1C6 Pelagic habitat condition (1.5.2, 1.6, 1.6.1, 1.6.2, 1.6.3) (2)
  • D6C5 Benthic habitat condition (1.6, 1.6.1, 1.6.2, 1.6.3, 6.2, 6.2.1, 6.2.2, 6.2.3, 6.2.4) (1)
  • D1 Biodiversity (4)
Target Number defined
67
4
1
1
2
1
Target code/description
A.L.9: Manage processes of invasions of alien species in an integrated manner, especially those identified in the initial evaluation of D2 in the DMLEBA, (blue crab Callinectes sapidus, macrophytes and the ascidian Aplidium accarense), including the development of early warning networks and their coordination at national level. * Percentage of the area within the demarcation area covered by detection and quantification networks of non-indigenous species. * Existence of action protocols for IAC screening events. * Number of marine species categorised on the list of invasive alien species * Percentage/number of invasive species subject to management measures or actions * Percentage/number of habitats affected by invasive species which have been subject to management measures or actions OBJECTIVE 2012: A.1.3, C.3.6
A.E.5: Promoting the consideration of marine species in the regional, national and international asset lists of threatened species, as well as their study * No. of marine species which are listed/delisted on lists and catalogues of threatened species, or change category. * No. of target species. OBJECTIVE 2012: C.1.1
C.L.12: Measures on stretches of coastline where permanent physical alterations caused by human activities have caused a significant impact so as to be compatible with the good environmental status of the seabed and hydrographical conditions. • No of measures taken in respect of each activity causing significant impact OBJECTIVE 2012: C.2.3
A.L.10: Ensuring regulatory compliance * Estimation of surveillance in hours * Infringements identified vs sanctions imposed * Human resources available for monitoring and equipment available. OBJECTIVE 2012: A.1.9
A.E.7: Improve national coordination and standardisation of habitat and species monitoring programmes * Existence of common methodologies/guides/protocols. * No. of meetings for updating the monitoring programmes. * Common access database for the various monitoring programmes. OBJECTIVE 2012: A.1.7
C.E.5: . To prevent impacts on trophic webs of the cultivation of marine species, with a focus on the cultivation of non-native and rare species. • Existence of preventive measures within the control programmes. OBJECTIVES 2012: A.1.5
C.L.11: To promote that the biological and permanent physical alterations caused by human activities do not threaten the persistence and operation of protected habitats or natural interests and do not jeopardise the achievement or maintenance of the GES for these habitats. * Percentage of compatibility reports on existing installations. * Area of protected habitats of natural interest affected by permanent physical alterations.
A.L.11: Increase awareness of food webs, with a view to developing new indicators to assess and define Good Environmental Status. There are adequate indicators to assess food webs. OBJECTIVE 2012: C. 3.8
A.1.2: anthropogenic translocation of translocation This objective will be gained as a new objective, given that the code and indicators have changed.
C.L.16: Encourage scientific studies and projects to address knowledge gaps identified in the initial assessment of the impact of human activities on marine and coastal ecosystems. * No. of studies and scientific projects promoted by public administrations dealing with these subjects. * Knowledge-based studies and scientific projects. OBJECTIVE 2012: C.3.5
A.L.7: Improve national coordination and standardisation of habitat and species monitoring programmes * Existence of common methodologies/guides/protocols. * No. of meetings for updating the monitoring programmes. * Common access database for the various monitoring programmes. OBJECTIVE 2012: A.1.7
A.1.9: Ensuring proper surveillance of the marine environment through remote or on-site systems In the second cycle, this objective has been amended to: A.L.10. Ensuring regulatory compliance This modified objective will be produced as a new objective, as the code and indicators have changed.
C.2.3: Take mitigation measures in coastal stretches where permanent physical alterations caused by human activities have caused a significant impact so that hydrodynamics and hydrodynamics properties are compatible with the conservation of habitats In the second cycle, the wording and the code have been slightly changed. C.L.12.Adopting measures on stretches of coastline where the alterations permanent physical physical activity caused by human activities a significant affection, so that they are compatible with the good condition environmental status of seabed and hydrographical conditions. This objective will be gained as a new objective, as the code and indicator has changed.
C.1.3: Ensuring social participation in the Marine Strategy of the demarcation of the Strait and Alboran Sea, through dissemination, awareness raising, voluntary environmental education and involvement of stakeholders in the marine environment. In the second cycle, this objective has remained the same, with the exception of the code: C.E.6. Ensure social participation in the Marine Strategy of the South Atlantic Basin through outreach, awareness-raising, voluntary environmental education and stakeholder involvement in the marine environment. This objective will be produced as a new one, as the code and indicators have changed.
A.1.1: And avoiding adverse effects of the exploitation of marine non-renewable resources on biogenic or protected habitats. In the second cycle, this objective has been amended to: C.E.1.Reducing the intensity and area of influence of the significant anthropogenic pressures on benthic habitats, with particular attention to protected habitats or natural interest. This modified objective will be produced as a new objective, as the code and indicators have changed.
C.E.18: Integrate into decision-making and management of the marine environment results and knowledge acquired through scientific studies, initiatives and projects on the impact of human activities on habitats, species, populations and communities * Criteria for evaluation and monitoring of the results of scientific projects/studies (based on the references in documents) * Objectives and management measures for which the design has taken into account the results of scientific projects/studies
A.L.1: Ensuring the conservation and restoration of marine biodiversity through effective tools and measures * Percentage of marine species/habitats not found or threatened, subject to conservation, restoration and restoration plans or national strategies. * Percentage of the demarcation included in Marine Protected Areas (MPAs), including RN2000. * Percentage of the area of habitats of Community interest included in RN2000. * Percentage of MPA with approved management plans and implementation. Objectives 2012: A.1.8, A2.2
C.L.19: Encourage the efficient monitoring of the ocean variables to enable the early detection of the occurrence of climatic anomalies which may put pressure on the different marine ecosystems. • National system for monitoring river basin variability and hydrodynamics, and system for alerts and recording of mass and extreme events
A.E.2: Achieve a complete, ecologically representative, coherent and well managed network of marine protected areas in the Strait and Alboran area. * Approval of the Master Plan for RAMPE. * Percentage of MPAs included in the Spanish network of Marine Protected Areas. OBJECTIVE 2012: A.2.1
C.L.8: Promote, through the Maritime Spatial Plan of the Levantino-Balearic Area and/or other development tools, that human activities be developed in a sustainable manner and do not jeopardise the achievement of the Good Environmental Status. * Number of human activities covered by the management plan OBJECTIVE 2012: C1.5
A.1.5: To prevent impacts on trophic webs of the cultivation of marine species, with a focus on the cultivation of non-native and rare species. In the second cycle, the objective has been maintained, although changing the code and indicators C.E.5. To prevent impacts on trophic webs of the cultivation of marine species, with a focus on the cultivation of non-native and rare species. This modified objective will be produced as a new objective, as the code and the code have changed.
A.1.3: Eradicate or decrease, preferably in the early stages of invasive procedures, the abundance of invasive species to ease pressure on the habitat, in cases where the economic or biodiversity loss is significant, and provided that it is technically feasible and there is no collateral damage. In the second cycle, this objective has been amended to: A.E.9 Manage processes for invasions of alien species in an integrated manner, especially those identified in the D2 DMESAL initial assessment, including the development of early warning networks and their coordination at national level. This modified objective will be produced as a new objective, as the code and indicators have changed.
C.3.9: Develop a national monitoring system for river basin and water variability and establish a target system for alerts on the occurrence of climatic abnormalities that may put pressure on the different marine ecosystems. The system should include a register of hydrographical and biological variables as well as mass and extreme events in marine ecosystems such as:Unusual planktonic blocks, appearance of unusual species in a certain zone and time of year, mass of species or process occurring (mortality, reproduction), etc. In the second cycle, this objective has been amended to: C.E.19. Encourage the efficient monitoring of the ocean variables to enable the early detection of the occurrence of climatic anomalies which may put pressure on the different marine ecosystems. This objective will be produced as a new one, as the code and indicators have changed.
B.L.17: Integrate into decision-making and management of the marine environment results and knowledge acquired through studies, initiatives and scientific projects on the impacts of the introduction of substances, litter and energy in the marine environment. * Criteria for evaluating and monitoring the results of scientific projects/studies. * Objectives and management measures for which the design has taken into account the results of scientific projects/studies.
B.E.17: Integrate into decision-making and management of the marine environment results and knowledge acquired through studies, initiatives and scientific projects on the impacts of the introduction of substances, litter and energy in the marine environment. * Criteria for evaluating and monitoring the results of scientific projects/studies. * Objectives and management measures for which the design has taken into account the results of scientific projects/studies.
A.L.4: To maintain positive or stable trends in the range of habitats protected or of natural interest and specific habitats. * Trends in habitat distribution area. Objective 2012: A3.5
C.L.17: Improving knowledge on the effects of climate change on marine and coastal ecosystems, with a view to mainstreaming climate change variable into all phases of Marine Strategies * Number of studies and scientific projects promoted by public administrations dealing with this issue * Number of monitoring indicators addressing climate change aspects * Percentage of climate change strategies in Marine Strategies OBJECTIVE 2012: C.3.5
C.1.4: Ensure proper coordination of public administrations, institutions and sectors in the Levantino-Balearic area which carry out work related to the marine environment, in such a way as to avoid duplication and to exploit synergies. In the second cycle, this objective has been amended to: C.L.7. Achieve proper coordination of public administrations, institutions and sectors in the South Atlantic basin that carry out work related to the marine environment, in such a way as to avoid duplication and exploit synergies. This objective will be gained as a new objective, given that the code and indicators have changed.
C.L.6: To ensure social participation in the marine strategy of the Levantino-Balearic area through dissemination, awareness-raising, voluntary environmental education and involvement of stakeholders in the marine environment. * Number of initiatives for social participation and evaluation of their results OBJECTIVE 2012: C.1.3
C.L.18: Integrate into decision-making and management of the marine environment results and knowledge acquired through scientific studies, initiatives and projects on the impact of human activities on habitats, species, populations and communities * Criteria for evaluation and monitoring of the results of scientific projects/studies (based on the references in documents) * Objectives and management measures for which the design has taken into account the results of scientific projects/studies
C.E.4: Reducing the disturbance to fauna caused by tourist and recreational activities * Number of individuals of the species potentially affected (for turtles and birds) * Number of established protection measures/initiatives to reduce pressure on these populations
C.E.15: Improving access to available marine information, in particular with regard to the descriptors of good environmental status, pressures and impacts, and socio-economic aspects, as well as ensuring the quality of this information for both administrations and institutions related to the sea, and for the general public. • Existence of platforms for access and exchange of information on the marine environment which facilitate the management of public administrations • Means of access and quality of marine environment information available to citizens • Number of metadata available OBJECTIVE C.3.1
C.3.1: Improving access to available marine information, in particular with regard to the descriptors of good environmental status, pressures and impacts, and socio-economic aspects, as well as ensuring the quality of this information. In the second cycle, this objective has been amended to: C.E.15. Improving access to available marine information, in particular with regard to the descriptors of good environmental status, pressures and impacts, and socio-economic aspects, as well as ensuring the quality of this information for both administrations and institutions related to the sea, and for the general public. This objective will be produced as a new one, as the code and indicators have changed.
C.1.3: To ensure social participation in the marine strategy of the Levantino-Balearic area through dissemination, awareness-raising, voluntary environmental education and involvement of stakeholders in the marine environment. In the second cycle, this objective has remained the same, with the exception of the code: C.L.6. Ensure social participation in the Marine Strategy of the South Atlantic Basin through outreach, awareness-raising, voluntary environmental education and stakeholder involvement in the marine environment. This objective will be gained as a new objective, given that the code and indicators have changed.
C.E.6: Ensuring social participation in the marine strategy of the Strait and Alboran area through initiatives for dissemination, awareness-raising, voluntary environmental education and involvement of stakeholders in the marine environment. * Number of initiatives for social participation and evaluation of their results OBJECTIVE 2012: C.1.3
A.E.1: Ensuring the conservation and restoration of marine biodiversity through effective tools and measures * Percentage of marine species/habitats not found or threatened, subject to conservation, restoration and restoration plans or national strategies. * Percentage of the demarcation included in Marine Protected Areas (MPAs), including RN2000. * Percentage of the area of habitats of Community interest included in RN2000. * Percentage of MPA with approved management plans and implementation. Objectives 2012: A.1.8, A2.2
C.E.17: Improving knowledge on the effects of climate change on marine and coastal ecosystems, with a view to mainstreaming climate change variable into all phases of Marine Strategies * Number of studies and scientific projects promoted by public administrations dealing with this issue * Number of monitoring indicators addressing climate change aspects * Percentage of climate change strategies in Marine Strategies OBJECTIVE 2012: C.3.5
C.1.1: Keep the lists of endangered species up to date and the assessment of their populations. In the second cycle, this objective has been amended to: A.E.5 Promote the consideration of marine species in the regional, national and international asset lists of threatened species, as well as their study. This objective will be produced as a new one, as the code and indicators have changed.
C.E.8: Promote, through the Maritime Spatial Plan of the Strait and Alboran area, or other development tools, that human activities take place in a sustainable manner and do not jeopardise the achievement of the Good Environmental Status. * Number of human activities covered by the management plan OBJECTIVE 2012: C1.5
C.L.4: Reducing the disturbance to fauna caused by tourist and recreational activities * Number of individuals of the species potentially affected (for turtles and birds) * Number of established protection measures/initiatives to reduce pressure on these populations
A.L.3.: Maintain or restore the natural balance of populations of key species for the ecosystem * Trends in populations of the species used as evaluation elements, corresponding to various trophic levels. * Indicators used for the assessment of food webs. OBJECTIVE 2012: A.3.4
C.1.1: Keep the lists of endangered species up to date and the assessment of their populations. In the second cycle, this objective has been amended to: A.L.5. Promoting the consideration of marine species in the regional, national and international asset lists of threatened species, as well as their study This objective will be gained as a new objective, given that the code and indicators have changed.
C.3.1: Improving access to available marine information, in particular with regard to the descriptors of good environmental status, pressures and impacts, and socio-economic aspects, as well as ensuring the quality of this information. In the second cycle, this objective has been amended to: C.L.15. Improving access to available marine information, in particular with regard to the descriptors of good environmental status, pressures and impacts, and socio-economic aspects, as well as ensuring the quality of this information for both administrations and institutions related to the sea, and for the general public. This objective will be produced as a new one, as the code and indicators have changed.
A.2.1: Promote the Network of Marine Protected Areas in Spain in the levantit Balearic district in order to adequately protect the biogenic habitats, protected habitats and other habitats identified in the initial assessment as being of particular interest, including a sufficient proportion of them and applying specific management measures. In the second cycle, this objective has been amended to: A.L.2.Achieve a complete, ecologically representative, coherent and well managed network of marine protected areas in the South Atlantic area. This objective will be gained as a new objective, given that the code and indicators have changed.
C.E.11: To promote that the biological and permanent physical alterations caused by human activities do not threaten the persistence and operation of protected habitats or natural interests and do not jeopardise the achievement or maintenance of the GES for these habitats. * Percentage of compatibility reports on existing installations. * Area of protected habitats of natural interest affected by permanent physical alterations.
C.L.5: . To prevent impacts on trophic webs of the cultivation of marine species, with a focus on the cultivation of non-native and rare species. • Existence of preventive measures within the control programmes. OBJECTIVES 2012: A.1.5
C.E.2: To minimise the potential for introduction or secondary expansion of non-native species, directly taking into account the anthropogenic pathways and vectors of translocation. * Number of policy/control measures on pathways and vectors for introduction and translocation * Number of introduction and translocation routes and translocation addressed by policy or regulated measures, such as: Leakages in aquaculture facilities, ballast water, anchoring, 'biofouling', live bait, and all types of discharges. * Number of events of introduction of invasive non-indigenous species by vector/track OBJECTIVES 2012: A.1.2
A.1.1: To prevent or reduce anchoring of the substandard rock habitats and sea bed and grassland habitats
A.L.8: Improve the coordination of monitoring and response to accidental catches and mortality events, including the monitoring of the incidental catch of turtles, mammals and seabirds on fishing vessels. * Adoption and implementation of coordination systems at national level (protocols, common data collection templates, common methodologies, common database) to address monitoring and response to these events. * Percentage of fleet involved in monitoring incidental catch (logbooks, specific actions...) OBJECTIVE 2012: A1.7
C.L.15: Improving access to available marine information, in particular with regard to the descriptors of good environmental status, pressures and impacts, and socio-economic aspects, as well as ensuring the quality of this information for both administrations and institutions related to the sea, and for the general public. • Existence of platforms for access and exchange of information on the marine environment which facilitate the management of public administrations • Means of access and quality of marine environment information available to citizens • Number of metadata available OBJECTIVE C.3.1
C.1.4: Ensure proper coordination of public administrations, institutions and sectors in the demarcation of the Strait and Alboran Sea, which carry out work related to the marine environment, in such a way as to avoid duplication and exploit synergies. In the second cycle, this objective has been amended to: C.E.7. Achieve proper coordination of public administrations, institutions and sectors in the South Atlantic basin that carry out work related to the marine environment, in such a way as to avoid duplication and exploit synergies. This objective will be produced as a new one, as the code and indicators have changed.
A.E.6: Improve international coordination of species monitoring programmes, especially for geographically wide-spread species (e.g. fish, cetaceans and reptiles). * Number of international initiatives and working groups involved. OBJECTIVE 2012: C1.2
00: Achieve or maintain the values and characteristics defined as GES for all descriptors of good environmental status in the Levantino-Balearic demarcation.
A.1.9: Ensure adequate surveillance of the marine environment through remote or on-site systems. In the second cycle, this objective has been amended to: A.E.10 Ensuring regulatory compliance. This modified objective will be produced as a new one, as the code and indicators have changed.
A.E.3.: Maintain or restore the natural balance of populations of key species for the ecosystem * Trends in populations of the species used as evaluation elements, corresponding to various trophic levels. * Indicators used for the assessment of food webs. OBJECTIVE 2012: A.3.4
A.E.11: Increase awareness of food webs, with a view to developing new indicators to assess and define Good Environmental Status. There are adequate indicators to assess food webs. OBJECTIVE 2012: C. 3.8
A.1.2: To minimise the potential for introduction or secondary expansion of non-indigenous species, directly taking into account the anthropogenic pathways and vectors of translocation (avoid leakages in aquaculture or aquarium installations, avoid transport and release into the medium of species associated with those cultivated outside their natural range, ballast water control, control of live bait, sediment discharge control, anchoring or cleaning of helmets). In the second cycle, this objective has been amended to: C.E.2. Minimise the potential for introduction or secondary expansion of non-native species, directly taking into account the anthropogenic pathways and vectors of translocation. This objective will be gained as a new objective, given that the code and indicators have changed.
C.E.7: Ensuring proper coordination of public administrations, institutions and sectors in the Strait and Alboran area who carry out work related to the marine environment, in such a way as to avoid duplication and to exploit synergies. * Number of initiatives, projects and coordination meetings * Thematic areas in which coordination initiatives are taken OBJECTIVE 2012: C.1.4
A. L.12: Improve knowledge of the seabed, including physical and biological characteristics. * Proportion of the assessment area studied. * Proportion of coastal habitats studied. * Proportion of deep habitats studied. OBJECTIVES 2012: C.3.2, C.3.3, C.3.4.
A.L.6: Improve international coordination of species monitoring programmes, especially for geographically wide-spread species (e.g. fish, cetaceans and reptiles). * Number of international initiatives and working groups involved. OBJECTIVE 2012: C1.2
C.L.7: Ensure proper coordination of public administrations, institutions and sectors in the Levantino-Balearic area which carry out work related to the marine environment, in such a way as to avoid duplication and to exploit synergies. * Number of initiatives, projects and coordination meetings * Thematic areas in which coordination initiatives are taken OBJECTIVE 2012: C.1.4
C.E.19: Encourage the efficient monitoring of the ocean variables to enable the early detection of the occurrence of climatic anomalies which may put pressure on the different marine ecosystems. • National system for monitoring river basin variability and hydrodynamics, and system for alerts and recording of mass and extreme events
A.1.5: To prevent impacts on trophic webs of the cultivation of marine species, with a focus on the cultivation of non-native and rare species In the second cycle, the objective has been maintained, although changing the code and indicators C.L.5. To prevent impacts on trophic webs of the cultivation of marine species, with a focus on the cultivation of non-native and rare species. This modified objective will be produced as a new objective, given that the code and the code have been changed.
00: Achieve or maintain the values and characteristics defined as GES for all descriptors of good environmental status at the boundary of the Strait and Alboran Sea.
A.L.5: Promoting the consideration of marine species in the regional, national and international asset lists of threatened species, as well as their study * No. of marine species which are listed/delisted on lists and catalogues of threatened species, or change category. * No. of target species. OBJECTIVE 2012: C.1.1
C.L.2: To minimise the potential for introduction or secondary expansion of non-native species, directly taking into account the anthropogenic pathways and vectors of translocation. * Number of policy/control measures on pathways and vectors for introduction and translocation * Number of introduction and translocation routes and translocation addressed by policy or regulated measures, such as: Leakages in aquaculture facilities, ballast water, anchoring, 'biofouling', live bait, and all types of discharges. * Number of events of introduction of invasive non-indigenous species by vector/track OBJECTIVES 2012: A.1.2
A.E.4: To maintain positive or stable trends in the range of habitats protected or of natural interest and specific habitats. * Trends in habitat distribution area. Objective 2012: A3.5
B.L.14: Encourage scientific studies, initiatives and projects on the impacts of the introduction of substances, litter and energy in the marine environment to address the knowledge gaps identified in the Initial Assessment and in the successive phases of Marine Strategies. * Awareness building on impacts arising from the introduction of substances, litter and energy in the marine environment, which are addressed by scientific studies and projects. OBJECTIVES 2012: B.3.1, B.3.2, B.3.3, B.3.4.
A.E.10: Ensuring regulatory compliance * Estimation of surveillance in hours * Infringements identified vs sanctions imposed * Human resources available for monitoring and equipment available. OBJECTIVE 2012: A.1.9
C.2.3: Take mitigation measures in coastal stretches where permanent physical alterations caused by human activities have caused a significant impact so that hydrodynamics and hydrodynamics properties are compatible with the conservation of habitats. In the second cycle, the wording and the code have been slightly changed. C.E.12.Take measures on stretches of coastline where alterations permanent physical physical activity caused by human activities a significant affection, so that they are compatible with the good condition environmental status of seabed and hydrographical conditions. This objective will be produced as a new one, as the code and indicator has changed.
A.L.2: Achieve a complete, ecologically representative, coherent and well-managed network of marine protected areas in the Levantino-Balearic area. * Approval of the Master Plan for RAMPE. * Percentage of MPAs included in the Spanish network of Marine Protected Areas. OBJECTIVE 2012: A.2.1
C.3.9: Develop a national monitoring system for river basin and water variability and establish a target system for alerts on the occurrence of climatic abnormalities that may put pressure on the different marine ecosystems. The system should include a register of hydrographical and biological variables as well as mass and extreme events in marine ecosystems such as:Unusual planktonic blocks, appearance of unusual species in a certain zone and time of year, mass of species or process occurring (mortality, reproduction), etc. In the second cycle, this objective has been amended to: C.L.19. Encourage the efficient monitoring of the ocean variables to enable the early detection of the occurrence of climatic anomalies which may put pressure on the different marine ecosystems. This objective will be gained as a new objective, given that the code and indicators have changed.
C.3.5: Increase awareness of the impact of human activities on habitats, especially biogenic and protected species, their species, populations and communities, their sensitivity, tolerance limits and acclimatisation and acclimatisation, especially in relation to fishing activities, infrastructure construction, dredging, extraction of non-renewable marine resources, pollution and interaction with the effects of climate change (acidification, heating, etc.). In the second cycle, this objective has been split into two: C.E.16. Encourage scientific studies and projects to respond to knowledge gaps identified in the initial assessment on the impact of human activities on marine and coastal ecosystems. C.E.17. Improving knowledge on the effects of climate change on marine and coastal ecosystems, with a view to mainstreaming cross-cutting issues
A.E.8: Improve the coordination of monitoring and response to accidental catches and mortality events, including the monitoring of the incidental catch of turtles, mammals and seabirds on fishing vessels. * Adoption and implementation of coordination systems at national level (protocols, common data collection templates, common methodologies, common database) to address monitoring and response to these events. * Percentage of fleet involved in monitoring incidental catch (logbooks, specific actions...) OBJECTIVE 2012: A1.7
A.1.3: In the second cycle, this objective has been amended to: A.L.9. Manage processes for invasions of alien species in an integrated manner, especially those identified in the initial evaluation of D2 in DMLEBA, (blue crab Callinectes sapidus, macrophytes algae or cidia Aplidium accarense), including the development of detection networks early and their coordination at national level. This modified objective will be produced as a new objective, as the code and indicators have changed.
C.3.5: Increase awareness of the impact of human activities on habitats, especially biogenic and protected species, their species, populations and communities, their sensitivity, tolerance limits and acclimatisation and acclimatisation, especially in relation to fishing activities, infrastructure construction, dredging, extraction of non-renewable marine resources, pollution and interaction with the effects of climate change (acidification, heating, etc.). In the second cycle, this objective has been split into two: C.L.16. Encourage scientific studies and projects to respond to knowledge gaps identified in the initial assessment on impact of human activities on marine and coastal ecosystems C.L.17. Improving knowledge on the effects of climate change in marine and coastal ecosystems, with a view to cross-cutting mainstreaming climate change variable in all phases of Marine Strategies
C.E.12: Measures on stretches of coastline where permanent physical alterations caused by human activities have caused a significant impact so as to be compatible with the good environmental status of the seabed and hydrographical conditions. • No of measures taken in respect of each activity causing significant impact OBJECTIVE 2012: C.2.3
C.E.16: Encourage scientific studies and projects to address knowledge gaps identified in the initial assessment of the impact of human activities on marine and coastal ecosystems. * No. of studies and scientific projects promoted by public administrations dealing with these subjects. * Knowledge-based studies and scientific projects. OBJECTIVE 2012: C.3.5
A. E.12: Improve knowledge of the seabed, including physical and biological characteristics. * Proportion of the assessment area studied. * Proportion of coastal habitats studied. * Proportion of deep habitats studied. OBJECTIVES 2012: C.3.2, C.3.3, C.3.4.
A.E.9: Manage processes for invasions of alien species in an integrated manner, especially those identified in the D2 DMESAL initial assessment, including the development of early warning networks and their coordination at national level. The area covered by networks of detection and quantification of non-native species. * Existence of action protocols for IAC screening events. * Number of marine species categorised on the list of invasive alien species * Percentage/number of invasive species subject to management measures or actions * Percentage/number of habitats affected by invasive species which have been subject to management measures or actions OBJECTIVE 2012: A.1.3, C.3.6
A.2.1: Promote the Network of Marine Protected Areas in Spain in the demarcation of the Strait and Alboran area, so as to adequately protect the biogenic habitats, protected habitats and other habitats identified in the initial assessment as being of particular interest, including a sufficient proportion of them and applying specific management measures. In the second cycle, this objective has been amended to: A.E.2. Achieve a complete, ecologically representative, coherent and well managed network of marine protected areas in the Strait and Alboran area. This objective will be produced as a new one, as the code and indicators have changed.
OE_MO_gen_I: Reduce the risk of introduction and spread of invasive non-native species
OE_MO_gen_A: Maintaining or restoring biodiversity and the functioning of coastal fund ecosystems (medio, infra and circalittoral)
OE_MO_gen_G: Reducing the input and presence of waste in marine waters (coastal, macro-waste, micro particles)
OE_MO_gen_F: Reduce contributions to the sea of chemical contaminants from the water catchment areas as described in the initial assessment
MT_Target_2019_D1C6_D5C1: Input of nutrient and organic matter into coastal waters from major catchment nodes and sea-based sources of nutrient enrichment does not give rise to effects of eutrophication.
D1C6: Maintain the status of the pelagic habitat type. In this context, it is also necessary to achieve the objectives set for the criteria D5C1, D5C2, D5C4. Upgrade the assessment methodology for the state of pelagic habitat types, as the current evaluation of the state of the pelagic habitat types has low reliability.
D1T1 - Pelagic habitat: Relative abundances and plankton biomass are not significantly changed from naturally occurring conditions. Taxonomic diversity is not changed significantly in relation to natural values.
Target 9: a) Posidonia oceanica shoot density is not decreasing. b) Relative abundances and plankton biomass are not significantly changed from naturally occuring conditions.
Target1: Target 1: The marine environment of Cyprus is considered to be in good environmental status by the year 2020 if biological diversity is maintained. The quality and occurrence of habitats and the distribution and abundance of species are in line with prevailing physiographic, geographic and climatic conditions. Quantitative target, calculated from 19 indicators (see Assessment method). This target and its indicators correspond to Descriptor 1 and relevant criteria and indicators.
Target value No. of parameters/elements with quantitative values
  • Not reported (28 - 100.0%)
  • Reported (0 - 0.0%)
  • Not reported (4 - 100.0%)
  • Reported (0 - 0.0%)
  • Not reported (1 - 100.0%)
  • Reported (0 - 0.0%)
  • Not reported (2 - 100.0%)
  • Reported (0 - 0.0%)
  • Not reported (4 - 100.0%)
  • Reported (0 - 0.0%)
Target status No. of assessments per category
  • Status not reported (22 - 78.6%)
  • Target achieved (4 - 14.3%)
  • Target not yet achieved (2 - 7.1%)
  • Status not reported (4 - 100.0%)
  • Status not reported (1 - 100.0%)
  • Target achieved (2 - 100.0%)
  • Status not reported (4 - 100.0%)
Assessment period No. of targets per period
2012-2018 (28 - 100.0%)
2012-2018 (4 - 100.0%)
2020-2025 (1 - 100.0%)
2013-2018 (2 - 100.0%)
2012-2018 (4 - 100.0%)
Timescale to achieve targets No. of targets per date
2020-12 (28 - 34.6%)
2024-12 (53 - 65.4%)
2020-12 (4 - 100.0%)
2025-12 (1 - 100.0%)
2024-12 (1 - 100.0%)
2020-10 (1 - 50.0%)
2024-12 (1 - 50.0%)
2018-12 (4 - 100.0%)
Update date No. of targets per date
2012-11 (28 - 34.6%)
2019-07 (53 - 65.4%)
2019-09 (4 - 100.0%)
2019-12 (1 - 100.0%)
2020-01 (1 - 100.0%)
2019-05 (1 - 50.0%)
2019-06 (1 - 50.0%)
2012-12 (4 - 100.0%)
Update type No. of targets per category
  • Modified from 2012 definition (26 - 32.1%)
  • New target (53 - 65.4%)
  • Target no longer needed (2 - 2.5%)
  • Target no longer needed (4 - 100.0%)
  • Modified from 2012 definition (1 - 100.0%)
  • New target (1 - 100.0%)
  • Modified from 2012 definition (1 - 50.0%)
  • Target no longer needed (1 - 50.0%)
  • Same as 2012 definition (4 - 100.0%)
Related indicators No. of different indicators reported
3
1
Related measures No. of different measures reported
19
1
2
1